参考文献/References:
[1] 王琳.论工程施工进度的影响因素及控制措施[J].科技经济市场, 2010(07):42-45.
WANG Lin. Influence factors and control measures of construction schedule[J]. Science & Technology Economy Market, 2010(07):42-45.
[2] 马玉亮,张爱萍.房屋建筑工程质量影响因素分析[J].中国住宅设施,2012(04):40-41.
MA Yuliang, ZHANG Aiping. Influencing factors on building quality[J]. China Housing Facilities, 2012(04):40-41.
[3] 薛新颖.施工项目成本控制的影响因素与有效措施分析[J].山西建筑,2013,39(14):227-228.
XUE Xinying. Analysis on influence factors and effective measures of construction project cost control[J]. Shanxi Architecture, 2013, 39(14): 227-228.
[4] 吕跃进.指数标度判断矩阵的一致性检验方法[J].统计与决策,2006(18): 31-32.
LV Yuejin. Consistency test method of exponential scale judgement matrix[J]. Statistics and Decision, 2006(18):31-32.
[5] YI Guangwang, QIN Huali. Fuzzy comprehensive evaluation of fire risk on high-rise buildings[J]. Procedia Engineering,2011(10):64-90.
[6] WEI Bing, WANG Songling, LI Li. Fuzzy comprehensive evaluation of district heating systems[J]. Energy Policy, 2010(10):113-124.
[7] GU Xiangbai. Hierarchy probability cost analysis modelincorporate MAIMS principle for EPC project cost estimation[J].Expert Systems with Applications,2011(07): 92-97.
[8] TAEWOO Nam, KEUNHYUK Yeom. Business-aware framework for supporting RFID-enabled applications in EPC Network[J]. Journal of Network and Computer Applications, 2011(3):34-44.
[9] Adrian Georgescu, Nicoleta Alexandru, Andrei Constantinescu, et al. The promise of EPC-based therapies on vascular dysfunction in diabetes[J].European Journal of Pharmacology,2011(13):121-132.
相似文献/References:
[1]刘 华,牛富俊,牛永红,等.基于模糊数学的寒区高速铁路路基稳定性评价及应用分析[J].西安建筑科技大学学报:自然科学版,2014,46(03):367.[doi:10.15986/j.1006-7930.2014.03.011]
LIU Hua,NIU Fujun,NIU Yonghong,et al.Comprehensive evaluation on stability of roadbed of high-speed railway in seasonal frozen regions based on fuzzy mathematic[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2014,46(01):367.[doi:10.15986/j.1006-7930.2014.03.011]
[2]王学通.中国现阶段总承包工程交易模式决策属性研究[J].西安建筑科技大学学报:自然科学版,2011,43(02):253.[doi:DOI :10.15986/j .1006-7930.2011.02.010]
WANG X ue-tong.Decision-making attributes of lump-sum contracting project delivery methods of China at present[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(01):253.[doi:DOI :10.15986/j .1006-7930.2011.02.010]
[3]吕景刚,李书全.基于模糊综合评价的建筑安全管理研究[J].西安建筑科技大学学报:自然科学版,2011,43(06):887.[doi:DOI:10.15986/j.1006-7930.2011.06.020]
.Research on construction safety evaluation based onfuzzy comprehensive evaluation[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(01):887.[doi:DOI:10.15986/j.1006-7930.2011.06.020]
[4]李明海,薛栋泽,王天豪.基于数据融合技术的室内环境品质评价[J].西安建筑科技大学学报:自然科学版,2017,49(04):611.[doi:10.15986/j.1006-7930.2017.04.024]
LI Minghai,XUE Dongze,WANG Tianhao.Indoor environment quality evaluation based on data fusion[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2017,49(01):611.[doi:10.15986/j.1006-7930.2017.04.024]
[5]朱玲,顾子卓,孙亚洲,等.汾渭平原历史城址分布规律及自然适宜性关系研究[J].西安建筑科技大学学报:自然科学版,2024,56(03):348.[doi:10.15986/j.1006-7930.2024.03.005]
ZHU Ling,GU Zizhuo,SUN Yazhou,et al.Distribution pattern of historical city sites and its relationship with their natural suitability in the Fen-Wei plain[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2024,56(01):348.[doi:10.15986/j.1006-7930.2024.03.005]