[1]张勇,刘杰,李慧民,等.EPC总承包模式下各因素对项目绩效的影响程度评价[J].西安建筑科技大学学报:自然科学版,2015,47(01):77-81+86.[doi:10.15986/j.1006-7930.2015.01.015]
 ZHANG Yong,LIU Jie,LI Huimin.Influence degree evaluation of various factors on the project performance based on EPC model[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(01):77-81+86.[doi:10.15986/j.1006-7930.2015.01.015]
点击复制

EPC总承包模式下各因素对项目绩效的影响程度评价()
分享到:

西安建筑科技大学学报:自然科学版[ISSN:1006-7930/CN:61-1295/TU]

卷:
47
期数:
2015年01期
页码:
77-81+86
栏目:
出版日期:
2015-02-28

文章信息/Info

Title:
Influence degree evaluation of various factors on the project performance based on EPC model
文章编号:
1006-7930(2015)01-0077-06
作者:
张勇;刘杰;李慧民;
西安建筑科技大学土木工程学院;西安建筑科技大学管理学院;
Author(s):
ZHANG Yong12 LIU Jie2LI Huimin1
1. School of Civil Engineering, Xi’an University of Architecture & Technology, Xi’an 710055,China;2. School of Management, Xi’an University of Architecture & Technology, Xi’an 710055,China
关键词:
工程总承包模糊综合评价项目绩效影响因素
Keywords:
EPCfuzzy comprehensive evaluationproject performanceinfluencing factors
分类号:
TU71
DOI:
10.15986/j.1006-7930.2015.01.015
文献标志码:
A
摘要:
我国已对工程总承包进行了一定程度的实践应用,但由于建设单位与施工单位的责任差异,使其在我国工程项目的实施中仍存在一定的问题.首先从EPC模式下影响项目绩效的因素出发,再结合模糊综合评价法对相关影响因素进行综合性评价,确定工程总承包模式下项目绩效影响因素的权重比例,最后针对权重较大的影响因素提出了控制措施.该研究将对EPC模式下工程顺利实施的深入研究具有一定参考价值.
Abstract:
EPC system has long been used in China, but because of the difference in the responsibility between owners and the construction units’ ,there still exist so it still has many problems in our engineering project. Firstly, the factors affecting the project running under EPC model are analyzed and Secondly, a comprehensive appraisal to the related influencing factor with the fuzzy comprehensive evaluation method is carried out. Thirdly, the weight ratio of each factoris calculated. To conclude, control measures for
the larger weighting factorsare proposed.The paper study about implementation of engineering based on EPC model model has a reference value.

参考文献/References:

[1] 王琳.论工程施工进度的影响因素及控制措施[J].科技经济市场, 2010(07):42-45.
WANG Lin. Influence factors and control measures of construction schedule[J]. Science & Technology Economy Market, 2010(07):42-45.
[2] 马玉亮,张爱萍.房屋建筑工程质量影响因素分析[J].中国住宅设施,2012(04):40-41.
MA Yuliang, ZHANG Aiping. Influencing factors on building quality[J]. China Housing Facilities, 2012(04):40-41.
[3] 薛新颖.施工项目成本控制的影响因素与有效措施分析[J].山西建筑,2013,39(14):227-228.
XUE Xinying. Analysis on influence factors and effective measures of construction project cost control[J]. Shanxi Architecture, 2013, 39(14): 227-228.
[4] 吕跃进.指数标度判断矩阵的一致性检验方法[J].统计与决策,2006(18): 31-32.
LV Yuejin. Consistency test method of exponential scale judgement matrix[J]. Statistics and Decision, 2006(18):31-32.
[5] YI Guangwang, QIN Huali. Fuzzy comprehensive evaluation of fire risk on high-rise buildings[J]. Procedia Engineering,2011(10):64-90.
[6] WEI Bing, WANG Songling, LI Li. Fuzzy comprehensive evaluation of district heating systems[J]. Energy Policy, 2010(10):113-124.
[7] GU Xiangbai. Hierarchy probability cost analysis modelincorporate MAIMS principle for EPC project cost estimation[J].Expert Systems with Applications,2011(07): 92-97.
[8] TAEWOO Nam, KEUNHYUK Yeom. Business-aware framework for supporting RFID-enabled applications in EPC Network[J]. Journal of Network and Computer Applications, 2011(3):34-44.
[9] Adrian Georgescu, Nicoleta Alexandru, Andrei Constantinescu, et al. The promise of EPC-based therapies on vascular dysfunction in diabetes[J].European Journal of Pharmacology,2011(13):121-132.

相似文献/References:

[1]刘 华,牛富俊,牛永红,等.基于模糊数学的寒区高速铁路路基稳定性评价及应用分析[J].西安建筑科技大学学报:自然科学版,2014,46(03):367.[doi:10.15986/j.1006-7930.2014.03.011]
 LIU Hua,NIU Fujun,NIU Yonghong,et al.Comprehensive evaluation on stability of roadbed of high-speed railway in seasonal frozen regions based on fuzzy mathematic[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2014,46(01):367.[doi:10.15986/j.1006-7930.2014.03.011]
[2]王学通.中国现阶段总承包工程交易模式决策属性研究[J].西安建筑科技大学学报:自然科学版,2011,43(02):253.[doi:DOI :10.15986/j .1006-7930.2011.02.010]
 WANG X ue-tong.Decision-making attributes of lump-sum contracting project delivery methods of China at present[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(01):253.[doi:DOI :10.15986/j .1006-7930.2011.02.010]
[3]吕景刚,李书全.基于模糊综合评价的建筑安全管理研究[J].西安建筑科技大学学报:自然科学版,2011,43(06):887.[doi:DOI:10.15986/j.1006-7930.2011.06.020]
 .Research on construction safety evaluation based onfuzzy comprehensive evaluation[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(01):887.[doi:DOI:10.15986/j.1006-7930.2011.06.020]
[4]李明海,薛栋泽,王天豪.基于数据融合技术的室内环境品质评价[J].西安建筑科技大学学报:自然科学版,2017,49(04):611.[doi:10.15986/j.1006-7930.2017.04.024]
 LI Minghai,XUE Dongze,WANG Tianhao.Indoor environment quality evaluation based on data fusion[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2017,49(01):611.[doi:10.15986/j.1006-7930.2017.04.024]
[5]朱玲,顾子卓,孙亚洲,等.汾渭平原历史城址分布规律及自然适宜性关系研究[J].西安建筑科技大学学报:自然科学版,2024,56(03):348.[doi:10.15986/j.1006-7930.2024.03.005]
 ZHU Ling,GU Zizhuo,SUN Yazhou,et al.Distribution pattern of historical city sites and its relationship with their natural suitability in the Fen-Wei plain[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2024,56(01):348.[doi:10.15986/j.1006-7930.2024.03.005]

备注/Memo

备注/Memo:
收稿日期:2013-12-31 修改稿日期:2015-01-30
基金项目:住房与城乡建设部资助课题项目(2013-R2-18)
作者简介:张勇(1965-),男,博士生,高级工程师,主要从事工程项目管理方面的研究.E-mail:xadayong@126.com
更新日期/Last Update: 1900-01-01