参考文献/References:
[1]徐学祖,邓友生.冻土中水分迁移的试验研究[M].北京:科学出版社,1991.
XU Xuezu,DENG Yousheng. Experimental study on moisture migration in frozen soil[M].Beijing: Science Press,1991.
[2]石刚强,王珣.哈大铁路客运专线路基填料冻胀性试验研究[J].铁道建筑,2011(10):61-63.
SHI Gangqiang,WANG Xun. Experimental study on frost heave property of subgrade filler in Harbin-Dalian Railway passenger dedicated line[J].Railway Engineering,2011(10):61-63.
[3]穆彦虎,马巍,牛富俊,等.多年冻土区道路工程病害类型及特征研究[J].防灾减灾工程学报,2014,34(3):259-267.
MU Yanhu,MA Wei,NIU Fujun,et al. Study on geotechnical hazards to roadway engineering in permafrost regions[J].Journal of Disaster Prevention and Mitigation Engineering,2014,34(3):259-267.
[4]KONDRATJEV V G. New methods of strengthening roadbed bases on very icy permafrost soils[C]// Proceedings of International Symposium on Cold Regions Engineering. Harbin: University of Harbin Industry Technology Press, 1996:7-10.
[5]KONDRATJEV V G,POZIN V A. Concept of geocryological monitoring system for railways under construction[J].Chita: Trans IGAM, 2000:31-48.
[6]黄新文,崔俊杰,易菊香.吉珲客运专线路基冻胀变形及影响因素分析[J].铁道标准设计,2015,59(8):39-42.
HUANG Xinwen,CUI Junjie,YI Juxiang. Analysis of frost heave deformation of the subgrade on Jilin-Hunchun dedicated passenger railway line[J].Railway Standard Design, 2015,59(8):39-42.
[7]石刚强.严寒地区高速铁路路基冻胀和工程对策研究[D].兰州:兰州大学, 2014.
SHI Gangqiang. Study on frost heave and engineering countermeasures of high speed railway subgrade in cold region[D].Lanzhou: Lanzhou University,2014.
[8]高卫东,刘明哲,魏文寿,等.铁路沿线风吹雪灾害及其防治研究[J].中国铁道科学,2004,25(5):97-101.
GAO Weidong,LIU Mingzhe,WEI Wentao,et al. Study on the drifting snow disaster along railway and preventive treatment[J].China Railway Science, 2004,25(5):97-101.
[9]林战举,牛富俊,刘华,等.青藏高原热融湖对冻土工程影响的数值模拟[J].岩土工程学报,2012,34(8):1394-1402.
LIN Zhanju,NIU Fujun,LIU Hua,et al.Numerical simulation of lateral thermal process of a thaw lake and its influence on permafrost engineering on Qinghai-Tibet Plateau[J].Chinese Journal of Geotechnical Engineering, 2012,34(8):1394-1402.
[10]GANDAHI R. Some aspects of the design of roads with boards of plasticfoam[C]//Proceeding of the 3rd International Conference on Permafrost.Edmonton: National Research Council of Canada,1978:792-797.
[11]JOHNSON G H. Performance of an insulated roadway on permafrost[C]// Proceeding of the 4th International Conference on Permafrost. Washington D.C.: National Academy Press, 1983:548-553.
[12]盛煜,张鲁新,杨成松,等.保温处理措施在多年冻土区道路工程中的应用[J].冰川冻土,2002,24(5):618-622.
SHENG Yu,ZHANG luxin,YANG Songcheng,et al. Application of thermal-insulation treatment to roadway engineering in permafrost regions[J].Journal of Glaciology and Geocryology,2002,24(5):618-622.
[13]苏谦,王迅,刘深.青藏铁路新型路基保温材料应用试验研究[J].西南交通大学学报,2007,42(4):395-399.
SU Qian, WANG Xun, LIU Shen. In-situ test on engineering application of new thermal-insulation materials in Qinghai-Tibet railway subgrade[J].Journal of Southwest Jiaotong University,2007,42(4):395-399.
[14]马立峰,刘建坤,李庆武.既有东北铁路多年冻土区路基病害整治效果研究[J].岩土工程学报,2009,31(3):475-479.
MA Lifeng,LIU Jiankun,LI Qingwu. Measures for roadbed problems of railways in permafrost regions of Northeast China[J].Chinese Journal of Geotechnical Engineering,2009,31(3):475-479.
[15]ZHANG M Y,ZHANG J M,LAI Y M.Numerical analysis for critical height of railway embankment in permafrost regions of Qinghai-Tibetan plateau[J].Cold Regions Science and Technology,2004,41(2):111-120.
[16]赵相卿,程佳,韩龙武,等.青藏铁路多年冻土区超过上临界高度路堤的分布及特征[J].中国铁道科学,2019,40(5):1-8.
ZHAO Xiangqing,CHENG Jia,HAN Longwu,et al. Distribution and characteristics of embankment over upper critical height in permafrost region of Qinghai-Tibet railway[J].China Railway Science,2019,40(5):1-8.
[17]马勤国,赖远明,吴道勇,等.多年冻土区铁路路堤临界高度研究[J].中国铁道科学,2015,36(6):8-15.
MA Qinguo,LAI Yuanming,WU Daoming,et al. Analysis of critical height of railway embankment in permafrost region[J].China Railway Science,2015,36(6):8-15.
[18]冯文杰,马巍,张鲁新,等.遮阳棚在寒区道路工程中的应用研究[J].岩土工程学报,2003, 25(5): 567- 570.
FENG Wenjie,MA Wei,ZHANG Luxin,et al. Application of awning to roadway engineering in permafrost regions[J].Chinese Jounal of Geotechnical Engineering,2003, 25(5): 567- 570.
[19]FENG W J,MA W,LI D Q,etal.Application investi-gation of awning to roadway engineering on Qinghai-Tibet Plateau[J].Cold Regions Science and Technology, 2006, 45:51- 58.
[20]KONDRATJEV V G. Strengthening railroad bass constructed on icy permafrost soil[C]// Proceedings of the Eighth International Conference on Cold Region Engineering.Fairbanks:ASCE,1996:688-699.
[21]李宁,康佳梅,全晓娟.高温冻土区一种新型路基护坡的冷却机理研究[J].岩土工程学报,2007,29(3):425-429.
LI Ning,KANG Jiamei,QUAN Xiaojuan. Study on cooling mechanism of a new type ripped-stone embankment in high temperature area[J].Chinese Jounal of Geotechnical Engineering,2007,29(3):425-429.
[22]李国玉,李宁,马巍.高温冻土区新型复合护坡降温机制研究[J].岩土力学,2010,31(1):165-173.
LI Guoyu,LI Ning,MA Wei.Cooling effects and mechanisms of crushed rock protective slopes combined with shading board on embankment in warm permafrost regions[J].Rock and Soil Mechanics,2010,31(1):165-173.
[23]胡明鉴,汪稔,葛修润,等.透壁通风管对青藏铁路路基的冷却效果试验初探[J].岩石力学与工程学报,2004,23(24):4195-4199.
HU Mingjian,WANG Ren,GE Xiurun,et al.AN experimental study on cooling effect of the perforated ventilation pipes on Qinghai-Tibet railway roadbed[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(24):4195-4199.
[24]程国栋,吴青柏,马巍.青藏铁路主动冷却路基的工程效果[J].中国科学,2009,39(1):16-22.
CHENG Guodong,WU Qingbai,MA Wei.The engineering effect of active cooling subgrade of Qinghai-Tibet railway[J].Science in China,2009,39(1):16-22.
[25]MIKHAILOV G P.Temperature regime of embankment consisting of coarse rock on permafrost[J].Transportation Construction,1971,12:32-33.
[26]GOERING DJ.Experimental investigation of air convection embankments for permafrost-resistant roadway design[C]//Proceeding of the 7th International Conference on Permafrost, Yellowknife. Canada: Collection Nordicana, 1998: 319-326.
[27]MA W,FENG G L,WU Q B,et al. Analyses of temperature fields under the embankment with crushed-rock structures along the Qinghai-Tibet railway[J].Cold Regions Science and Technology,2008,53:259-270.
[28]穆彦虎,马巍,孙志忠,等.青藏铁路块石路基冷却降温效果对比分析[J].岩土力学,2010,31(S1):284-292.
MU Yanhu,MA Wei,SUN Zhizhong,et al.Rock and soil mechanics[J].Rock and Soil Mechanics,2010,31(S1):284-292.
[29]全晓娟,李宁,李国玉.冻土地区一种新型抛石护坡路基的研究[J].岩石力学与工程学报,2006,25(8):1645-1651.
QUAN Xiaojuan,LI Ning,LI Guoyu.Study on embankment with new-type rock revetment in permafrost regions[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(8):1645-1651.
[30]王爱国,马巍,吴志坚.块石路堤冷却效果关键因素研究[J].岩土工程学报,2011,33(S1):211-215.
WANG Aiguo,MA Wei,WU Zhijian.Key factors influencing cooling effect of block-stone embankment on frozen soil foundation[J].Chinese Journal of Geotechnical Engineering,2011,33(S1):211-215.
[31]鲍维猛,刘建坤.多年冻土区片石通风路基温度场数值模拟[J].岩土工程界,2004,7(3):52-55.
BAO Weimeng,LIU Jiankun. Numerical simulation of the temperature field of a fragmented ventilation subgrade in permafrost regions[J].Geological Exploration for Non-ferrous Metals,2004,7(3):52-55.
[32]徐学祖,孙斌祥,赖远明,等.青藏铁路片石路基长期使用效果分析[J].冰川冻土,2004,26(1):101-105.
XU Xuezu,SUN Binxiang,LAI Yuanming,et al. Study on the long-term effects of ballast embankment of the Qinghai-Tibet railway[J].Journal of Glaciology and Geocryology,2004,26(1):101-105.
[33]魏静,许兆义,包黎明,等.青藏铁路片石气冷护坡措施实体工程试验研究[J].岩石力学与工程学报,2006,25(5):1062-1068.
WEI Jing,XU Zhaoyi,BAO Liming,et al.Experimental study on air-cooling embankment with rubble slope protection along Qinghai-Tibet railway[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(5):1062-1068.
[34]YU W B, LAI Y M, ZHANG X F,et al.Laboratory investigation on cooling effect of coarse rock layer and fine rock layer in permafrostregions[J].Cold Regions Science and Technology, 2004, 38(1): 31- 42.
[35]LAI Y M,ZHANG L X,ZHANG S J, et al. Cooling effect of ripped-stone embankments on Qinghai-Tibet railway under climatic warming[J].Chinese Science Bulletin,2003,48(6):598-604.
[36]LIG Y,LI N,KANG J M. Preliminary study on cooling effect mechanisms of Qinghai-Tibet railway embankment with open crushed-stone side slope in permafrost regions[J].Cold Regions Science and Technology,2006,45:193-201.
[37]徐学祖,孙斌祥,刘琦,等.碎石铺设位置及粒径对路基降温效果影响的室内试验[J].岩土工程学报,2005,27(3):254-257.
XU Xuezu,SUN Binxiang,LIU Qi,et al.Laboratory experiment on the influence of paving location and diameter on the cooling effect of ballast embankment[J].Chinese Journal of Geotechnical Engineering,2005,27(3):254-257.
[38]WEN Z, SHENG Y, MA W,et al.Analysis on effect of permafrost protection by two-phase closed thermosyphon and insulation jointly in permafrost regions[J].Cold Regions Sci.Tech., 2005, 43(3): 150-163.
[39]侯彦东,吴青柏,孙志忠,等.青藏铁路碎石护坡-热管复合措施的补强效果研究[J].冰川冻土,2015,37(1):118-125.
HOU Yandong,WU Qingbai,SUN Zhizhong,et al.The coupled reinforcing effect of crushed rock slope protection and thermosyphons in Qinghai-Tibet railway[J].Journal of Glaciolgy and Geocryology,2015,37(1):118-125.
[40]LI R,XUE X G, BAO L M. Applications and technical characteristics of thermal pipe subgrade in Qinghai-Tibet railway design[J].Journal of Glaciology and Geocryology, 2004, 26(S): 151-154.
[41]ZHANG Mingyi, LAI Yuanming,ZHANG Jianming, et al. Numerical study on cooling characteristics of two- phase closed thermsyphon embankment in permafrost regions[J].Cold Regions Science and Technology, 2011,65(2):203-210.
[42]潘卫东,逢愈,邓宏艳,等.寒区工程中热棒技术的应用原理和前景[J].岩石力学与工程学报,2003,22(S2):2673-2676.
PAN Weidong,FENG Yu,DENG Hongyan,et al. Application principle and prospect of thermal-probe technique in cold region engineering[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(S2):2673-2676.
[43]李永强,吴志坚,王引生,等.青藏铁路冻土路基热棒应用效果试验研究[J].中国铁道科学, 2008,29(6):6-11.
LI Yongqiang,WU Zhijian,WANG Yinsheng,et al. Test study on the application effect of the thermal pipes on the roadbed in the permafrost region along Qinghai-Tibet railway[J].China Railway Science 2008,29(6):6-11.
[44]温智,盛煜,马巍,等.青藏铁路保温板热棒复合结构路基保护冻土效果数值分析[J].兰州大学学报,2006,42(3):14-19.
WEN Zhi,SHENG Yu,MA Wei,et al. Analysis on the effect of permafrost protection by two-phase closed joint thermosyphon and insulation in permafrost regions[J].Journal of Lanzhou University,2006,42(3):14-19.
[45]LAI Y M,ZHANG X F,XIAO J Z,et al. Nonlinear Analysis for frost-heaving force[J].Journal of Thermal Stresses,2005,28(3):317-331.
[46]肖建章,赖远明,张学富,等.青藏铁路旱桥的三维温度特性分析[J].冰川冻土,2004,26( 4):426-434.
XIAO Jianzhang,LAI Yuanming,ZHANG Xuefu,et al. Three-dimensional temperature character analysis of the land bridge on the Qinghai-Tibet railway[J].Journal of Glaciology and Geocryology, 2004,26(4):426-434.
[47]林宗兆.哈大高速铁路桥梁设计概述[J].铁道标准设计,2018,62(10):82-87.
LIN Zongzhao. Design of Harbin-Dalian high-speed railway bridge[J].Railway Standard Design,2018,62(10):82-87.