参考文献/References:
[1] POLLACK J.The changing paradigms of project management[J].International Journal of Project Management,25(3):266-274.
[2] JAAFARI A.Project management in the age of complexity and change[J].Project Management Journal,2003,34(4):47-57.
[3] ROSSEAU D M,SITKIN B,BURT RS,et al.Not so different after all:a cross-discipline view of trust[J].Academy of Management Review,1998,23(3):393-404.
[4] 彭泗清.信任的建立机制关系运作与法制手段[J].社会学研究,1999(2):53-66.
[5] LIM C S,MOHAMED M Z.Criteria of project success:an explanatory re-examination[J].International Journal of Project Management,1999,17:243-248.
[6] 杨 静.供应链内企业间信任的产生机制及其对合作的影响[D].杭州:博士学位论文,浙江大学,2006.
YANG Jing.Qccumence mechanism of trust and its influnce on cooperation among enterprises in slapply chian[D].Hangzhou:Zhejing University,2006.
[7] GRAHAM W,McDermott Peter.Searching for trust in the UK construction industry:an interim view [C].CIBW92Procurement Systems Conference,1999.
[8] KARLSEN J T.Forming relationships with stakeholders in engineering projects[J].European Journal of Industrial Engineering,2008,2(1):35-49.
[9] WONG J E S,THEN D,SKITMORE R M.Antecedents of trust in intra-organisational relationships within three Singapore public sector construction project management agencies[J].Construction Management and Economics,2000,18(7):797-806.
[10] CHEUNG Sai-On,THOMAS S T N,WONG Shek-Pui,et al.Behavioral aspects in construction partnering[J].International Journal of Project Management,2003,21(5):333-343.
[11] MALIK M A Khalfan,Peter McDermott,SWAN W.Building trust in construction projects[J].Supply Chain Management:An International Journal,2007,12(6):385-391.
[12] THOMPSON I,COX A,ANDERSON L.Contracting strategies for the project environment[J].European Journal of Purchasing &Supply Management,1998,4:31-41.
[13] JANNADIA MO,ASSAF S,BUBSHAIT AA,et al.Contractual methodsfor dispute avoidance and resolution(DAR)[J].International Journal of Project Management,2000,18(6):41-9.
[14] 侯杰泰,温忠麟,成子娟.结构方程模型及其应用[M].北京:教育科学出版社,2004.
HOU Jie,WEN Zhon-lin,CHENG Zi-juan.Stueture equation model and its application[M].Beijing:Education Science Prees,2004.
[15] 李怀祖.管理研究方法论[M ].西安:西安交通大学出版社,2004.
LI Huai-zu.Mangement researoh mathodology[M].Xi′an:Jiaotong University Press.2004.
[16] KENNETH B.Structural equations with latent variables[M].New York:John Wiley & Sons,1989.
[17] MEDSKER Gina J,WILLIAMS Larry J,HOLAHAN Patricia J.A review of current practices for evaluating casual models in organizational behavior and human resources management research.Journal of Management,1994,20(2):439-464.
[18] BAGOZZI R P.On the evaluation of structural equation models[J].Journal of the Academy of Marketing Science,1988,16(1):74-94.
[19] HAIR J,ANDERSON R,TATHAM R,et al.Multivariate data analysis[M].Englewood Cliffs,NJ:Prentice Hall,1998.
[20] 黄芳铭.结构方程模式:理论与应用[M].北京:中国税务出版社,2005.
HUANG Fang-ming.Stnceture equation model:theory and application[M].Beijing:China Tax Press,2005.
[21] STEIGER J H.Structural model evaluation and modification:an interval estimation approach[J].Multivariate Behavioral Research,1990,25:173-180.
相似文献/References:
[1]卢 梅,刘 洋,金 婷,等.基于SD及模糊控制的工程项目目标管理[J].西安建筑科技大学学报:自然科学版,2012,44(03):400.[doi:10.15986/j.1006-7930.2012.03.016]
LU Mei,LIU Yang,JIN Ting,et al.Objective management in the project based on the SD and fuzzy control[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2012,44(01):400.[doi:10.15986/j.1006-7930.2012.03.016]
[2]史玉芳,李慧民,陆宁.工程项目施工系统可靠性及计算方法研究[J].西安建筑科技大学学报:自然科学版,2011,43(01):125.[doi:DOI:10.15986/j.1006-7930.2011.01.001]
SHI Yu-fang,LI Hui-min,LU Ning.Research on construction system reliability of construction projectand its calculation method[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(01):125.[doi:DOI:10.15986/j.1006-7930.2011.01.001]
[3]史玉芳,王秀芬,康 珅.基于模糊的工程项目施工可靠性评价研究[J].西安建筑科技大学学报:自然科学版,2015,47(05):740.[doi:DOI:10.15986/j.1006-7930.2015.05.023]
SHI Yufang,WANG Xiufen,KANG Shen.Study on evaluation of construction reliability for engineering project[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(01):740.[doi:DOI:10.15986/j.1006-7930.2015.05.023]
[4]史泽运,李勇.基于系统动力学的国际工程项目承包商单因素风险处置模式逻辑构建研究[J].西安建筑科技大学学报:自然科学版,2018,50(04):609.[doi:10.15986/j.1006-7930.2018.04.022]
SHI Zeyun,LI Yong.Research on the logical construction of single factor risk disposal model for international engineering project contractors based on system dynamics[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2018,50(01):609.[doi:10.15986/j.1006-7930.2018.04.022]