参考文献/References:
[1] 侯 旸.浅析当前招标投标所存在的问题和对策[J].中国招标,2006(4):52-54.
HOU Yang.Analysis on tendering and bidding problems and countermeasures[J].China Tendering,2006(4):52-54.
[2] 齐 进.我国建设工程招标投标定标运行的现状?存在问题及建议[J].中国招标,2007(2):37-38.
QI Jin.The status quo of Chinas construction project delivering,problems and suggestions[J].China Tendering.2007(2):37-38.
[3] 张学文.熵究竟是什么,熵与交叉科学[M].北京:气象出版社,1988:23-29.
ZHANG Xue-wen.What does entrpy is,Entrpy and Interdisciplinary Science[M].Beijing:Meteorological Press,1988,23-29.
[4] SMITH S A.A derivation of entropy and the maximum entropy criterion in the context of decision problems[J].IEEE Transactions on systems,Man,and Cybernetics,1968,SMC-4:157-168.
[5] 田文水,顾 敏,王志磊.关于串标?围标的博弈研究[J].沿海企业与科技,2006(3):171-172.
TIAN Wen-shui,GU Min,WANG ZHi-lei.Game analysis of the problem of colluding in bidding and together-conspired bidding[J].Coastal Enterprises and Science & Technology,2006(3):171-172.
[6] ODUSOTE O O,FELLOWS R F.An Examination of the Importance of Resource Considerations When Contractors Make Project Selection Deisions[J].Construction Management and Economics,1992(10):137-151.
[7] AHMAD I,MINKARCH I A.Optimum Markup for Bidding:A Preference-Uncertainty Trade Off Approach[J].Civil Engineering System,1987(4):170-174.
[8] DOZZI S P,ABOURIZK Z M,SCHROEDER S L.Utility-Theory Model for Bid Markup Decisions[J].Journal of Construction Engineering and Management,1996,122(2):119-124.
[9] AHMAD I.MINKARCH I A.Questionnaire Survey on Bidding in Construction[J].Journal of Management in Engineering,1988,4(3):229-243.
相似文献/References:
[1]叶堃晖,李炳恒,申立银,等.我国区域建筑市场竞争强度研究[J].西安建筑科技大学学报:自然科学版,2011,43(05):654.[doi:DOI :10.15986/j .1006-7930.2011.05.011]
Y E K un-hui,LI B ing-heng,SHEN Li-y in,et al.Investigation on the competitive situations in China’ s regionalconstruction markets[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(05):654.[doi:DOI :10.15986/j .1006-7930.2011.05.011]