参考文献/References:
[1] FENG Chung-wei, LIU Liang, BURNS Scott A.Usinggeneticalgorithmstosolveconstructiontime-costtrade-offproblems [J].Journal of Computingin Civil Engineering, 1997,11(3):184-189.
[2] LI Heng, LOVE Peter.Usingimproved geneticalgorithmstofacilitatetime-costoptimization [J].Journal of Con-struction Engineeringand Management, 1997,123(3):233-237.
[3] LI Heng, CaoJ, LOVE Peter.Using machinelearningand geneticalgorithmtosolvetime-costtrade-offproblems[J].Journal of Construction Engineeringand Management, 1999,125(5):347-353.
[4] LEU Sou-sen, CHEN An-Ting, YANG Chung-huei.A GA-basedfuzzy optimal modelfor constructiontime-costtrade-off [J].InternationalJournal of Project Management, 2001(19):47-58.
[5] ZHENG D X M, Ng S T, KUMARASWAMY , M M.Applyinga geneticalgorithm-based multi-objectiveapproachfortime-costoptimization [J].Journalof Construction Engineeringand Management, 2004, 130(2):168-176.
[6] ZHENG D X M, Ng S T.Stochastictime-costoptimization modelincorporatingfuzzysetstheoryand nonreplace-ablefront [J].Journal of Construction Engineeringand Management, 2005, 131(2):176-186.
[7] ELBELTAGI Emad, HEGAZYB Tarek, GRIERSON Donald.Comparisonamongfiveevolutionary-basedoptimiza-tionalgorithms [J].Advanced EngineeringInformatics, 2005(19):43-53.
[8] 熊 鹰, 匡亚萍. 基于蚁群算法的施工项目工期 -成本优化[J]. 系统工程理论与实践,2007,3(3),105-111.
XIONG Ying, KUANG Ya-ping.Time-Cost Trade-Off of Construction Project based on Ant Colony Algorithm[J].Systems Engineering2007,3(3),105-111.
[9] YANGI T.Usingelitist particleswarmoptimizationtofacilitate bi-criteriontime-costtrade-offanalysis [J].Jour-nal of Construction Engineeringand Management, 2007, 133(7):498-505.
[10] ZONG Woo Geem.Multi-objective Optimization of Time-Cost Trade-Off Using Harmony Search [J].Journal ofConstruction Engineeringand Management, 2010, 136(6):711-716.
[11] KHALAFALLA Ahmed, ABDEL-RAHEEM Mohamed.Electimize: New Evolutionary Algorithmfor Optimization withApplicationin Construction Engineering [J].Journalof Computingin Civil Engineering, 2011, 25(3):192-201.
[12] LIU Liang, BURNS Scott A, FENG Chung-wei.Construction time-cost trade-off analysis using LP/IP hybridmethod [J].Journal of Construction Engineering Management, 1995, 121(4):446-454.
[13] ABDEL-RAHEEM Mohamed, KHALAFALLA Ahmed.Using Electimizeto Solvethe Time-Cost-Tradeoff Prob-lemin Construction Engineering [C].Computingin Civil Engineering, 2011, 250-257.
[14] ABDEL-RAHEEM Mohamed, KHALAFALLA Ahmed.Introductionofa New Optimization Mechanismfor Elec-timize [C]//2011UKSim13thInternational Conferenceon Modellingand Simulation, 2011:8-13.