[1]申建红,杜怡萱,韦佑鑫.基于电子优化算法的项目工期-成本优化[J].西安建筑科技大学学报:自然科学版,2013,45(04):597-601.[doi:10.15986/j.1006-7930.2013.04.023]
 SHEN Jian-hong,DU Yi-xuan,WEI You-xin.Time-cost trade-off of project based on electimize[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2013,45(04):597-601.[doi:10.15986/j.1006-7930.2013.04.023]
点击复制

基于电子优化算法的项目工期-成本优化()
分享到:

西安建筑科技大学学报:自然科学版[ISSN:1006-7930/CN:61-1295/TU]

卷:
45
期数:
2013年04期
页码:
597-601
栏目:
出版日期:
2013-08-31

文章信息/Info

Title:
Time-cost trade-off of project based on electimize
文章编号:
1006-7930(2013)04-0597-05
作者:
申建红1杜怡萱1韦佑鑫2
(1.青岛理工大学管理学院,山东 青岛 266520; 2.中国建筑第八工程局一公司,河南 郑州 453500)
Author(s):
SHEN Jian-hong1DU Yi-xuan1WEI You-xin2
(1.School of Management, Qingdao Technological University, Qingdao 266520,China; 2.The First Company Engineering Bureau LTD, Zhengzhou 453500,China)
关键词:
工期-成本优化电子优化算法遗传算法精英档案
Keywords:
time-cost trade-off problem electimize genetic algorithm elitist archive
分类号:
F281
DOI:
10.15986/j.1006-7930.2013.04.023
文献标志码:
A
摘要:
针对不同工序多方案条件下的项目工期-成本优化问题,引入了一种新的算法———电子优化算法(Electimize).在建立工期-成本优化的数学模型并简要介绍算法原理的基础上,应用MATLAB软件对算法进行编程,引入精英档案存储提高寻优效率,实现了最低成本对应的最优工期搜索.针对一个经典算例,采用电子优化算法进行优化,并将其结果与遗传算法和枚举法的结果进行对比,进而验证了该算法的可行性与适用性.
Abstract:
Aiming at time-cost trade-off problem in which each activity has several optional methods respectively, a new algorithm-named electimiz-was introduced. Based on establishing the mathematical model and introducing briefly the principle of electimize, MATLAB was adopted to code the algorithm, Elitist archive was embedded to accelerate the searching for optimal solutions, and finally the optimal time corresponding to the least cost was attained. Finally, a classical case was tested using electimize, and its result was compared with that of genetic algorithm and Enumeration method, which demonstrated the feasibility and applicability of electimize

参考文献/References:

[1] FENG Chung-wei, LIU Liang, BURNS Scott A.Usinggeneticalgorithmstosolveconstructiontime-costtrade-offproblems [J].Journal of Computingin Civil Engineering, 1997,11(3):184-189.
[2] LI Heng, LOVE Peter.Usingimproved geneticalgorithmstofacilitatetime-costoptimization [J].Journal of Con-struction Engineeringand Management, 1997,123(3):233-237.
[3] LI Heng, CaoJ, LOVE Peter.Using machinelearningand geneticalgorithmtosolvetime-costtrade-offproblems[J].Journal of Construction Engineeringand Management, 1999,125(5):347-353.
[4] LEU Sou-sen, CHEN An-Ting, YANG Chung-huei.A GA-basedfuzzy optimal modelfor constructiontime-costtrade-off [J].InternationalJournal of Project Management, 2001(19):47-58.
[5] ZHENG D X M, Ng S T, KUMARASWAMY , M M.Applyinga geneticalgorithm-based multi-objectiveapproachfortime-costoptimization [J].Journalof Construction Engineeringand Management, 2004, 130(2):168-176.
[6] ZHENG D X M, Ng S T.Stochastictime-costoptimization modelincorporatingfuzzysetstheoryand nonreplace-ablefront [J].Journal of Construction Engineeringand Management, 2005, 131(2):176-186.
[7] ELBELTAGI Emad, HEGAZYB Tarek, GRIERSON Donald.Comparisonamongfiveevolutionary-basedoptimiza-tionalgorithms [J].Advanced EngineeringInformatics, 2005(19):43-53.
[8] 熊 鹰, 匡亚萍. 基于蚁群算法的施工项目工期 -成本优化[J]. 系统工程理论与实践,2007,3(3),105-111.
XIONG Ying, KUANG Ya-ping.Time-Cost Trade-Off of Construction Project based on Ant Colony Algorithm[J].Systems Engineering2007,3(3),105-111.
[9] YANGI T.Usingelitist particleswarmoptimizationtofacilitate bi-criteriontime-costtrade-offanalysis [J].Jour-nal of Construction Engineeringand Management, 2007, 133(7):498-505.
[10] ZONG Woo Geem.Multi-objective Optimization of Time-Cost Trade-Off Using Harmony Search [J].Journal ofConstruction Engineeringand Management, 2010, 136(6):711-716.
[11] KHALAFALLA Ahmed, ABDEL-RAHEEM Mohamed.Electimize: New Evolutionary Algorithmfor Optimization withApplicationin Construction Engineering [J].Journalof Computingin Civil Engineering, 2011, 25(3):192-201.
[12] LIU Liang, BURNS Scott A, FENG Chung-wei.Construction time-cost trade-off analysis using LP/IP hybridmethod [J].Journal of Construction Engineering Management, 1995, 121(4):446-454.
[13] ABDEL-RAHEEM Mohamed, KHALAFALLA Ahmed.Using Electimizeto Solvethe Time-Cost-Tradeoff Prob-lemin Construction Engineering [C].Computingin Civil Engineering, 2011, 250-257.
[14] ABDEL-RAHEEM Mohamed, KHALAFALLA Ahmed.Introductionofa New Optimization Mechanismfor Elec-timize [C]//2011UKSim13thInternational Conferenceon Modellingand Simulation, 2011:8-13.

备注/Memo

备注/Memo:
收稿日期:2013-- 修改稿日期:2013--
基金项目:山东省自然科学基金资助项目(ZR2009FM045)
作者简介:申建红(1970-),男,山东青岛人,博士,教授,主要从事土木工程风场实测及结构抗风、工程项目质量与安全及工程风险及信息管理方面研究.
更新日期/Last Update: 2015-10-05