参考文献/References:
[1] 李志坚.建筑工程进度影响因素及其控制措施[J].建筑设计管理,2010.(2):68-69.
LI Zhijian. Factors affecting the construction and control measures[J].Arch. Desi. Mana., 2010(2):68-69.
[2] 林晶晶.考虑资源可替代性的关键链识别与缓冲设置方法研究[D]. 成都:西南交通大学,2011.
LIN Jingjing. Study on critical chain identification and buffer settlement considering research substitutability[D].Chengdu: Southwest Jiaotong University,2011.
[3] 查京民,王波.关键链法在项目进度规划中的应用研究[J].工程管理学报,2014.28(5):73-77.
ZHA Jingmin,WANG Bo.Critical chain in project schedule planning[J]. Journal of Engineering Management, 2014,28(5): 73-77.
[4] 郭波.新建变电站项目进度管理及应用研究[D].北京:华北电力大学,2012.
GUO Bo. New substation project schedule management and applied sesearch[D]. Beijing: North China Electric Power University,2012.
[5] 李双辰,王艳春.基于灰色关联的关键链缓冲设置方法研究[J].科技管理研究, 2013,(9): 203-206.
LI Shuangchen, WANG Yanchun. Study on critical buffer sizing based on GAR[J].Science and Technology Management Research, 2013,(9): 203-206.
[6] XIE Xuemei, YANG Guang, LIN Chuang. Software development projects IRSE buffer settingsand simulation based on critical chain[J].The Journal of China University of Posts and Telecommunications,2010, 17(1): 100-106.
相似文献/References:
[1]罗福周,刘 静.基于建设项目多目标综合优化的关键链缓冲区研究[J].西安建筑科技大学学报:自然科学版,2013,45(06):902.[doi:10.15986/j.1006-7930.2013.06.026]
LUO Fu-zhou,LIU Jing.Multi-objective comprehensive optimization research on critical chain buffering construction project[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2013,45(04):902.[doi:10.15986/j.1006-7930.2013.06.026]