[1]蒋红妍,宗海龙,周 博.工程项目任务扰动的综合度量与方案优选[J].西安建筑科技大学学报:自然版,2015,47(05):655-659.[doi:DOI: 10.15986/j.1006-7930.2015.05.008]
 JIANG Hongyan,ZONG Hailong,ZHOU Bo.Comprehensive measurement of project activity disruption and plan optimization[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(05):655-659.[doi:DOI: 10.15986/j.1006-7930.2015.05.008]
点击复制

工程项目任务扰动的综合度量与方案优选()
分享到:

西安建筑科技大学学报:自然版[ISSN:1006-7930/CN:61-1295/TU]

卷:
47
期数:
2015年05期
页码:
655-659
栏目:
出版日期:
2015-10-29

文章信息/Info

Title:
Comprehensive measurement of project activity disruption and plan optimization
文章编号:
1006-7930(2015)05-0655-05
作者:
蒋红妍宗海龙周 博
(西安建筑科技大学土木工程学院,陕西 西安 710055 )
Author(s):
JIANG Hongyan ZONG Hailong ZHOU Bo
(School of Civil Engineering, Xian Univ. of Arch . & Tech ., Xian 710055, China)
关键词:
任务扰动业主满意度工期扰动扰动成本
Keywords:
activity disruption owner satisfaction project duration disturbance disturbance cost
分类号:
TU712
DOI:
DOI: 10.15986/j.1006-7930.2015.05.008
文献标志码:
A
摘要:
任务扰动是项目实施中的常见干扰,干扰管理中首先要对其进行识别并量化,据此采取措施使项目恢复到正常状态,同时保证新调整方案与初始计划的偏差最小.分析了项目的任务扰动,选定业主成本不满意度、工期扰动、扰动成本等三项指标来描述任务扰动对项目执行的影响,建立了各项指标的量化公式;通过无量纲化处理,得到了任务扰动的综合度量方法.在任务扰动的项目调整方案优选中,该法不仅考虑了扰动对成本、工期的影响,还强调了“扰动最小”的原则.最后通过算例进行了调整方案的优选,可为干扰管理实践提供依据.
Abstract:
Activity disruption is a common interference in project implementation. The identification and quantification of disturbance is the basic work in interference management. It is necessary to bring the project back to normal track, and ensure the deviation between new adjustment plan and the initial plan minimum. In this paper, there are three indexes including owner dissatisfaction disturbance, time deviation disturbance and disturbing cost in describing the effect of disturbance on the execution of the project. This paper proposes a methodology to solve disruption management, and quantitative formulas for these above indicators are set up. T hen through dimensionless processing, a comprehensive task disturbance measurement is presented. In selection of preferred readjustment plan, this measurement not only considers the impact of disturbance on the cost and schedule, but also emphasize s the "minimum disturbance" ideas. Finally, the optimal adjustment plan was chosen by comparison , which provide s the basis for interference management practices.

参考文献/References:

References

[1] Y Gang, Q Xiangtong. Disruption management: framework, models and applications[M]. Singapore: World Scientific Publishing Co.Pte.Ltd, 2004.

[2] ZHU G, BARD J F, YU G. Disruption management for resource-constrained project scheduling[J].Journal of the Operational Research Society,2005,56(4):365-381.

[3] 刘志霞.资源受限项目调度问题及其任务扰动的干扰管理研究[D]. 沈阳: 沈阳工业大学, 2011:40-51.

LIU Zhixia. Research on the resource-constrained

project scheduling problem and disruption management for activity disruption [D]. Shenyang: Shenyang University of Technology, 2011:40-51.

[4] 朱宾梅, 刘晓君, 王智辉. 基于精益建造下工程项目质量、成本、工期三要素管理的新思维[J].建筑经济. 2007, (11): 13-15.

ZHU Binmei, LIU Xiaojun, WANG Zhihui. New management thinking of the three elements of project quality, cost and time limit based on lean construction [J]. Construction Economy. 2007 ,(11): 13-15.

[5] 乌日娜, 徐方舟, 陆惠民. 项目资源约束下工期最短-资源均衡优化算法[J].项目管理技术. 2013,11(7): 103-107.

WU rina, XU fangzhou, LU huimin. Under the project resource constrained shortest duration-resource leveling optimization algorithm[J]. Project Management Technology. 2013,11(7): 103-107.

[6] 杨耀红, 张俊华, 曹继辉.工程项目建设监理的业主满意度分析[J].华北水利水电学院学报.2003,24(2): 70-71.

YANG Yaohong , ZHANG Junhua, CAO Jihui . Analysis on employer satisfaction with construction supervision for engineering project[J]. Journal of North China Institute of Water Conservancy and Hydroelectric Power. 2003 ,24(2): 70-71.

[7] 梁燕.关于顾客满意度指数的若干问题研究[J]. 统计研究.2003, 11(11): 52-56.

LIANG Yan. Research on several problems about the customer satisfaction index[J]. Statistical Research. 2003, 11(11): 52-56.

[8] 郭亚军, 易平涛. 线性无量纲化方法的性质分析[J].统计研究.2008,25(2): 93-100.
GUO Yajun, YI Pingtao. Character analysis of linear
dimensionless methods[J].Statistical Research. 2008,
25(2): 93-100.

备注/Memo

备注/Memo:
收稿日期:2015-04-03 修改稿日期:2015-09-28
基金项目:国家自然科学基金资助项目(51408459);陕西省自然科学基金资助项目(2014JM7296)
作者简介:蒋红妍(1974-),女,博士,副教授,主要从事土木工程建造与管理的教学和科研工作.E-mail: ggjianghy@163.com
更新日期/Last Update: 2015-12-14