[1]吴 涛,刘全威,张 磊,等.预制混凝土构件钢筋约束浆锚连接技术发展展望[J].西安建筑科技大学学报:自然版,2015,47(06):776-780.[doi:10.15986/j.1006-7930.2015.06.002]
 WU Tao,LIU Quanwei,ZHANG Lei,et al.Research on constraint grout-filled lap connection for precast concrete[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(06):776-780.[doi:10.15986/j.1006-7930.2015.06.002]
点击复制

预制混凝土构件钢筋约束浆锚连接技术发展展望()
分享到:

西安建筑科技大学学报:自然版[ISSN:1006-7930/CN:61-1295/TU]

卷:
47
期数:
2015年06期
页码:
776-780
栏目:
出版日期:
2016-01-15

文章信息/Info

Title:
Research on constraint grout-filled lap connection for precast concrete
文章编号:
1006-7930(2015)06-0776-05
作者:
吴 涛1刘全威1张 磊1白国良2徐亚洲2
( 1. 长安大学建筑工程学院,陕西 西安 710061;2. 西安建筑科技大学土木工程学院, 陕西 西安 710055 )
Author(s):
WU Tao1 LIU Quanwei1 ZHANG Lei1 BAI Guoliang2 XU Yazhou2
( 1. School of Civil Engineering, Chang’an university, Xi’an 710061,China; 2. School of Civil engineering, Xi’an Univ. of Arch. & Tech., Xi’an 710055, China )
关键词:
预制构件装配式混凝土结构约束浆锚连接间接搭接
Keywords:
prefabricated component prefabricated concrete structure constraint grout-filled lap connection indirect lap
分类号:
TU375
DOI:
10.15986/j.1006-7930.2015.06.002
文献标志码:
A
摘要:
约束浆锚连接是我国近几年发展的一种适用于预制构件的钢筋连接技术.本文分析了约束浆锚连接的工作机理和技术要点,详细介绍了国内现有的插入式预留孔灌浆钢筋搭接连接和NPC浆锚插筋连接的连接构造、试验研究和工程应用,并对二者的技术要点进行了对比分析.介绍了各省装配式混凝土结构技术规程在约束浆锚连接技术方面的相关规定.指出了约束浆锚连接技术目前存在的问题,对约束浆锚连接技术提出了研究和发展建议.
Abstract:
Constraint grout-filled lap connection is a kind of bar connection technology for prefabricated component in recent years. This paper analyzes the connecting mechanism and technical points of constraint grout-filled lap connection. It also introduces the connection structure, experimental investigations and engineering application of plug-type preformed grout hole reinforcement connection and rebar lapping in grout-filled hole formed with metal bellow. The regulations of the technical regulations for the construction of the concrete structure of the provinces are compared and analyzed. On the basis of analyzing the existing problems of constraint grout-filled lap connection technology, the research and development suggestion are put forward

参考文献/References:

References

[1] 梁厚双. 装配式建筑的发展及优势[J]. 砖瓦世界,2011(9): 21-23.

LIANG Houshuang. Development and advantages of the assembly building[J]. Brick & Tile World, 2011(9): 21-23.

[2] 徐义屏. 预制装配化: 建筑业转型升级的重要途径[J].建筑, 2013(15): 8-9.

XU Yiping. Prefabricated assembly: an important way of building industry transformation and upgrading[J]. Construction and Architecture, 2013(15): 8-9.

[3] 蒋勤俭. 中国建筑产业化发展研究报告[J]. 混凝土世界. 2014(7): 10-20.

JIANG Qinjian. Research report on development of construction industry in China[J]. China Concrete, 2014(7): 10-20.

[4] 陈建伟, 苏幼坡. 预制装配式剪力墙结构及其连接技术[J]. 世界地震工程, 2013, 29(1): 38-48.

CHEN Jianwei, SU Youpo. Prefabricated concrete shear wall structure and its connecting technology[J]. World Earthquake Engineering. 2013, 29(1): 38-48.

[5] 刘琼, 李向民, 许清风. 预制装配式混凝土结构研究与应用现状[J]. 施工技术, 2014, 43(22): 9-14.

LIU Qiong, LI Xiangmin, XU Qingfeng. Present research and application of precast concrete structure[J]. Construc-tion Technology, 2014, 43(22): 9-14.

[6] 李晓明. 装配式混凝土结构关键技术在国外的发展与应用[J]. 住宅产业, 2011(6): 16-18.

LI Xiaoming. Development and application of key technology of assembly concrete structure in foreign countries[ J]. Housing Industry, 2011(6): 16-18.

[7] 邢亚. 非接触方式钢筋绑扎搭接连接的工作机理分析及应注意的问题[J]. 工程质量, 2012(6): 56-58.

XING Ya. Principle analysis and attentive points of non-touched steel bar lap joint and connection[J]. Construction Quality, 2012(6): 56-58.

[8] 赵唯坚, 郭婉楠, 金峤, 等. 预制装配式剪力墙结构竖向连接形式的发展现状[J]. 工业建筑, 2014, 44(4):115-121.

ZHAO Weijian, GUO Wannan, JIN Qiao, et al. State of the art research on connection type of vertical components for precast concrete shear wall systems[J]. Industrial Construction, 2014, 44(4): 115-121.

[9] GB/T 50448-2008 水泥基灌浆材料应用技术规范[S].北京: 中国计划出版社, 2008.

GB/T 50448-2008 Code for application technical of cementitious grout[S]. Beijing: China Planning Press, 2008.

[10] 刘文清, 姜洪斌, 耿永常, 等. 插入式预留孔灌浆钢筋搭接连接构件: 中国, ZL200820090150. 6[P]. 2009-04-05.

LIU Wenqing, JIANG Hongbin, GENG Yongchang, et al. The member of plug-type preformed grout hole reinforcement connection: China, Patent number: ZL200820090150. 6 [P]. 2009-04-05.

[11] 姜洪斌, 张海顺, 刘文清, 等. 预制混凝土结构插入式预留孔灌浆钢筋锚固性能[J]. 哈尔滨工业大学学报,2011, 43(4): 28-31.

JIANG Hongbin, ZHANG Haishun, LIU Wenqing, et al. Experimental study on plug-in filling hole for steel bar anchorage of the PC structure[J]. Journal of Harbin Institute of Technology, 2011, 43(4): 28-31.

[12] 姜洪斌, 张海顺, 刘文清, 等. 预制混凝土插入式预留孔灌浆钢筋搭接试验[J]. 哈尔滨工业大学学报, 2011,43(10): 18-23.

JIANG Hongbin, ZHANG Haishun, LIU Wenqing, et al. Experimental study on plug-in filling hole for steel bar lapping of precast concrete structure[J]. Journal of Harbin Institute of Technology. 2011, 43(10): 18-23.

[13] 赵培. 约束浆锚钢筋搭接连接试验研究[D]. 哈尔滨:哈尔滨工业大学, 2011.

ZHAO Pei. Experimental research on restraint grouting- anchoring overlap-joint of steel bar[D]. Harbin: Harbin Institute of Technology, 2011.

[14] 邰晓峰. 预制混凝土剪力墙抗震性能试验及约束浆锚搭接极限研究[D]. 哈尔滨: 哈尔滨工业大学, 2012.

TAI Xiaofeng. Research on seismic performance of precast RC shear wall and limited length of overlap-joint restraint grouting-anchoring[D]. Harbin: Harbin Institute of Technology, 2012.

[15] 杨勇. 带竖向结合面预制混凝土剪力墙抗震性能试验研究[D]. 哈尔滨: 哈尔滨工业大学, 2011.

YANG Yong. Experimental research on seismic performance of precast shear wall with vertical joint surface[D]. Harbin Institute of Technology, 2011.

[16] 钱稼茹, 彭媛媛, 秦珩, 等. 竖向钢筋留洞浆锚间接搭接的预制剪力墙抗震性能试验[J]. 建筑结构, 2011,41(2): 7-11.

QIAN Jiaru, PENG Yuanyuan, QIN Heng, et al. Tests on seismic behavior of pre-cast shear walls with vertical reinforcements grouted in holes and spliced indirectly[J]. Building Structure, 2011, 41(2): 7-11.

[17] DB23T 1400-2010 预制装配整体式房屋混凝土剪力墙结构技术规范[S]. 黑龙江省住房和城乡建设厅, 2011.

DB23T 1400-2010 Technical specification for concrete shear wall structure assembled with precast components[ S]. Housing and urban and Rural Construction Department of Heilongjiang Province, 2011.

[18] 张军, 侯海泉, 董年才, 等. 全预制装配整体式剪力墙住宅结构设计及应用[J]. 施工技术, 2009, 38(5): 22-24.

ZHANG Jun, HOU Haiquan, DONG Niancai, et al. Design and application of assembly integral shear wall residence with prefabricated reinforced concrete[J]. Construction Technology, 2009, 38(5): 22-24.

[19] 陈云钢, 刘家彬, 郭正兴, 等. 预制混凝土结构波纹管浆锚钢筋锚固性能试验研究[J]. 建筑技术, 2014, 45(1):65-67.

CHEN Yungang, LIU Jiabin, GUO Zhengxing, et al. Experimental study on grouting connection in bellows for steel bar anchorage of precast concrete structure[J]. Architecture Technology, 2014, 45(1): 65-67.

[20] 陈耀刚. 工业化全预制装配整体式剪力墙结构体系节点研究[J]. 建筑技术, 2010, 41(2): 153-156.

CHEN Yaogang. Research on industrialized fully pre-fabricated assembly integral shear wall structure system nodes[J]. Architecture Technology. 2010, 41(2): 153-156.

[21] 朱张峰, 郭正兴. 装配式短肢剪力墙平面模型抗震性能试验[J]. 哈尔滨工业大学学报, 2012, 44(4): 94-99.

ZHU Zhangfeng, GUO Zhengxing. Test research on seismic performance of plane model of new precast concrete short-limbed shear wall[J]. Journal of Harbin Institute of Technology, 2012, 44(4): 94-99.

[22] DGJ32/TJ125-2010 预制装配整体式剪力墙结构体系技术规程[S]. 江苏省住房和城乡建设厅, 2010.

DGJ32/TJ125-2010 Technical specification for precast concrete shear wall structures[S]. Housing and urban and Rural Construction Department of Jiangsu Province, 2010.

[23] 张延年, 马佳宝, 王元清. 预制剪力墙连接方式构造比较分析[J]. 建筑与预算, 2014(2): 30-34.

ZHANG Yannian, MA Jiabao, WANG Yuanqing. Comparison and analysis of the connection method of precast shear wall[J]. Construction and Budget. 2014(2): 30-34.

[24] JGJ1-2014 装配式混凝土结构技术规程[S]. 北京: 中国建筑工业出版社, 2014.

JGJ1-2014 Technical specification for precast concrete structures[S]. Beingjing: China Architecture & building Press, 2014.

[25] DB23T1400-2010 预制装配整体式房屋混凝土剪力墙结构技术规范[S]. 黑龙江省住房和城乡建设厅, 2011.

DB23T1400-2010 Technical specification for concrete shear wall structure assembled with precast components[ S]. Housing and urban and Rural Construction Department of Heilongjiang Province, 2011.

[26] DB11/1003-2013 装配式混凝土框架和框架剪力墙结构设计规程[S]. 北京市住房和城乡建设局, 2013.

DB11/1003-2013 Design Specification for Precast Concrete Frame and Frame-Shear Wall Structure[S]. Housing and urban and Rural Construction Department of Beijing, 2013.

[27] 装配整体式混凝土剪力墙结构体系住宅技术规程[S].吉林省住房和城乡建设厅, 2013.

Technical regulation of assembled monolithic concrete shear wall structure system residential housing[S]. Housing and urban and Rural Construction Department of Jilin Province, 2013.

[28] DBJ61/T 87-2014 装配整体式混凝土结构技术规程[S].陕西省住房和城乡建设厅, 2014.

DBJ61/T 87-2014 Technical specification for assembled monolithic concrete structure[S]. Housing and urban and Rural Construction Department of Shanxi Province, 2014.

[29] DB42/T1044-2015 装配整体式混凝土剪力墙结构技术规程[S]. 湖北省住房和城乡建设厅, 2014.

DB42/T1044-2015 Technical specification for assembled precast concrete shear wall structures[S]. Housing and urban and Rural Construction Department of Hubei Province, 2014.

[30] DGJ32TJ125-2010 预制装配整体式剪力墙结构体系技术规程[S]. 江苏省住房和城乡建设厅, 2010.

DGJ32TJ125-2010 Technical specification for precast concrete shear wall structures[S]. Housing and urban and Rural Construction Department of Jiangsu Province, 2010.

[31] 钱冠龙, 郝志强. 预制混凝土构件的水泥灌浆钢筋连接构造: 中国, CN103216044A[P]. 2013-07-24.

QIAN Guanlong, HAO Zhiqiang. Connection structure of cement grouting reinforcement of precast concrete elements: China, CN103216044A[P]. 2013-07-24.

相似文献/References:

[1]程凯凯,姚继涛.钢筋混凝土预制构件裂缝宽度检验的可靠性分析[J].西安建筑科技大学学报:自然版,2014,46(03):376.[doi:10.15986/j.1006-7930.2014.03.012]
 CHENG Kaikai,YAO Jitao.Reliability analysis of crack width inspection for prefabricated members of reinforced concrete[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2014,46(06):376.[doi:10.15986/j.1006-7930.2014.03.012]

备注/Memo

备注/Memo:
收稿日期:2015-07-01 修改稿日期:2015-12-11
基金项目:陕西省科技统筹创新工程计划项目(2015KTZDSF03-04); 陕西省科技统筹创新工程计划项目(2015KTZDSF03-05-01)
作者简介:吴涛(1976-),男,博士,教授,主要研究方向为钢筋混凝土结构基本理论及工程结构抗震性能.E-mail:wutao@chd.edu.cn
更新日期/Last Update: 2016-01-29