[1]吴凤平,徐辉英,卢佳宇,等. PC住宅楼工程施工现场安全管理探讨[J]. 建筑安全,2016(4):16-19.WU Fengping,XU Huiying,LU Jiayu,et al.Discussion on construction site safety management of PC residential building[J].Construction Safety,2016(4):16-19.
[2]黄桂林,胡明路. 基于可拓学理论的装配式住宅施工过程安全风险评价研究[J].工业安全与环保,2017(2):33-38.
HUANG Guilin,HU Minglu.Research on safety risk assessment in prefabricated residential construction process based on extension theory[J].Industrial Safety and Environmental Protection,2017(2):33-38.
[3]汤彦宁. 基于系统动力学的装配式住宅施工安全风险研究[D].西安:西安建筑科技大学,2015.
TANG Yanning.Research on estimation of construction safety risks for prefabricated housing based on system dynamics[D].Xi′an: Xi′an Univ. of Arch. and Tech., 2015.
[4]李高锋,施佳呈,郝风田,等. 浅析预制装配式住宅施工安全管理与措施[J]. 价值工程,2016(24):316-318.
LI Gaofeng, SHI Jiacheng, HAO Fengtian,et al. Construction safety management research of prefabricated residential building and measures[J].Value Engineering,2016(24):316-318.
[5]李颖,李峰,邹宇,等. 预制装配式混凝土建筑施工安全和质量评估[J]. 建筑技术,2016(4):305-309.
LI Ying,LI Feng,ZOU Yu,et al.Evaluations of safety and quality performances of precast concrete construction[J]. Architecture Technology, 2016(4):305-309.
[6]刘迪. 装配式混凝土建筑的安全施工管理[J]. 建筑施工,2016(7):991-992.
LIU Di.Safety construction management of fabricated concrete building[J].Building Construction,2016(7): 991-992.
[7]陈伟,付杰,熊付刚,等. 装配式建筑工程施工安全灰色聚类测评模型[J]. 中国安全科学学报,2016(11):70-75.
CHEN Wei,FU Jie, XIONG Fugang,et al.Grey clustering evaluation model for construction safety of fabricated building project[J].China Safety Science Journal,2016(11):70-75.
[8]罗杰,宋发柏,沈李智,等. 装配式建筑施工安全管理若干要点研究[J].建筑安全,2016(8):19-25.
LUO Jie,SONG Fabai,SHEN Lizhi,et al.Research on some key points of safety management of fabricated construction[J].Construction Safety,2016(8):19-25.
[9]杨爽. 装配式建筑施工安全评价体系研究[D].沈阳:沈阳建筑大学,2016.
YANG Shuang.Safety evaluation system of prefabreicated builing construction[D].Shenyang: Shenyang Jianzhu University, 2016.
[10]田黎. 预制装配式混凝土(PC)住宅营建过程风险管理方法与策略[D].上海:华东理工大学,2014.
TIAN Li.Risk Management methods and strategies for prefabricated concrete residence construction[D]. Shanghai: East China University of Science and Technology,2014.
[11]张文佳,李慧民,赵地.基于可信性测度理论的装配式建筑施工过程风险性评估[J].工业安全与环保,2017,43(8):13-17,86.
ZHANG Wenjia,LI Huimin,ZHAO Di.Risk assessment of prefabricated construction process based on the credibility measure[J].Industrial Safety and Environmental Protection,2017,43(8):13-17,86.
[12]王光远.未确知信息及其数学处理[J].哈尔滨建筑工程学院学报,1990,23(4):1-8.
WANG Guangyuan.UncertaintyInformation and its mathematical treatment[J]. Journal of Harbin Architecture and Engineering Institute,1990,23(4):1-8.
[13]裴兴旺,李慧民,孟海,等.多因素耦合作用下建筑火灾后加固施工过程风险性评估[J].中国安全生产科学技术,2016,12(7):156-162.
PEI Xingwang, LI Huimin, MENG Hai, et al. Risk assessment on reinforcement construction process of post- fire building by multiple-factor coupling[J]. Journal of Safety Science and Technology, 2016,12(7):156-162.
[14]阳富强,吴超.基于未确知测度理论的硫化矿石爆堆自燃危险性评价[J].中南大学学报:自然科学版,2010,41(6):2373-2380.
YANG Fuqiang,WU Chao.Risk assessment on spontaneous combustion of sulfide ore dump in stope based on uncertainty measurement theory[J]. Journal of Central South University:Science and Technology,2010,41(6):2373-2380.
[15]宫凤强,李夕兵,董陇军,等. 基于未确知测度理论的采空区危险性评价研究[J].岩石力学与工程学报,2008,27(2):323-330.
GONG Fengqiang,LI Xibing,DONG Longjun,et al.Underground goaf risk evaluation based on uncertainty measurement theory[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(2):323-330.
[16]王新民,王石,鄢德波,等.基于未确知测度理论的充填管道堵塞风险性评价[J].中国安全科学学报,2012,22(4) :151-156.
WANG Xinmin,WANG Shi,YAN Debo,et al.Risk assessment on blocking of filling pipeline based on uncertainty measurement theory[J].China Safety Science Journal,2012,22(4) :151-156.