[1]许有俊,张治华,史明,等.土压平衡矩形顶管正面附加推力对地表隆起变形影响研究[J].西安建筑科技大学学报(自然科学版),2019,51(06):814-824.[doi:10.15986/j.1006-7930.2019.06.007]
 XU Youjun,ZHANG Zhihua,SHI Ming,et al.Study on the effect of positive additional thrust on the surface uplift deformation by the construction of the rectangular pipe jacking with earth pressure balance[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2019,51(06):814-824.[doi:10.15986/j.1006-7930.2019.06.007]
点击复制

土压平衡矩形顶管正面附加推力对地表隆起变形影响研究()
分享到:

西安建筑科技大学学报(自然科学版)[ISSN:1006-7930/CN:61-1295/TU]

卷:
51
期数:
2019年06期
页码:
814-824
栏目:
出版日期:
2019-12-31

文章信息/Info

Title:
Study on the effect of positive additional thrust on the surface uplift deformation by the construction of the rectangular pipe jacking with earth pressure balance
文章编号:
1006-7930(2019)06-0814-11
作者:
许有俊1张治华1史明1王万华2康佳旺1
(1.内蒙古科技大学 土木工程学院,内蒙古 包头 014010;2.内蒙古路桥集团有限责任公司,内蒙古 呼和浩特 010052)
Author(s):
XU Youjun1 ZHANG Zhihua1 SHI Ming1 WANG Wanhua2 KANG Jiawang1
(1.The School of Civil Engineering, Inner Mongolia University of Science and Technology, Baotou 014010,China;2. Inner Mongolia Road and Bridge Group Co Ltd.,Huhhot 010052,China)
关键词:
地表快速隆起变形正面附加推力刀盘挤土压力刀盘转速比顶进速度
Keywords:
surface rapid uplift deformationpositive additional thrustthe pressure on the cutter to squeeze the soilthe proportion of cutter rotate speedspeed of pipe jacking machine
分类号:
TU605
DOI:
10.15986/j.1006-7930.2019.06.007
文献标志码:
A
摘要:
以全国最长的大截面矩形顶管综合管廊工程为背景,基于弹性力学Mindlin解和随机介质理论,分析顶管施工对地表隆起变形的影响.研究发现:地表隆起过程可分为四个阶段,分别为缓慢隆起阶段、快速隆起阶段、沉降阶段和稳定阶段,并得到地表隆起超限主要集中在快速隆起阶段,该阶段地表快速隆起变形的主要诱因是正面附加推力,其次为顶管机摩擦力和后续管节摩擦力;刀盘挤土压力对正面附加推力影响很大,基于弹性力学Kelvin解,并引入刀盘转速比,得到大、小刀盘转速比在0~0.2范围内时对刀盘挤土压力影响很大;基于进出土平衡理论,并引入螺旋机转速比,得到它对刀盘开口处土压力影响很小,但顶进速度对刀盘开口处土压力影响很大;综合各因素得知,在矩形顶管施工参数中,刀盘转速比和顶进速度对正面附加推力影响很大,是造成地表隆起变形的主要原因.
Abstract:
This paper study the influence of top pipe construction on ground surface uplift deformation, which is based upon Elastic mechanics Mindlin solution and stochastic medium theory, and the nation’s longest largesection rectangular pipe jacking utility project. The process of surface uplift deformation can be divided for four stages, including slow uplift stage, rapid uplift stage, subsidence stage and stabilization stage. The transfinite surface uplift deformation mainly focus on the rapid uplift stage that main inducement is the positive additional thrust, and second inducement is the pipe jacking friction and following pipe joint friction. It is a large influence element for the pressure on the cutter to squeeze the soil to the proportion of big and small cutter rotate speed when it’s range from 0 to 0.2, based on elastic mechanics Kelvin solution. Based on the theory of in and out soil balance, we bring in the proportion of screw machine rotate speed, it is a small influence element for the earth pressure at cutter opening, but speed of pipe jacking machine is a large influence element for it. To conclusion, the proportion of cutter rotate speed and speed of pipe jacking are a large influence element for the positive additional thrust, and then for the surface uplift deformation.

参考文献/References:

[1]彭立敏, 王哲.矩形顶管技术发展与研究现状[J].隧道建设,2015,35(1):1-7.

PENG Limin, WANG Zhe. Technological development and research status of rectangular pipe jacking method[J]Tunnel Construction, 2015,35(1):1-7.
[2]魏纲, 黄志义, 徐日庆. 顶管施工引起地面变形的计算方法研究[J].岩石力学与工程学报,2005,24(S2):5808- 5815.
WEI Gang, HUANG Zhiyi, XU Riqing. Study on Calculation Methods of Ground Deformation Induced by Pipe Jacking Construction[J]. Chinese Journal of Rock Mechanics and Engineering, 2005,24(S2): 5808-5815.
[3]魏纲, 陈春来, 余剑英. 顶管施工引起的土体垂直变形计算方法研究[J]. 岩土力学,2007,28(3):619-624.
WEI Gang, CHEN Chunlai, YU Jianying. Study on calculating methods of soil vertical deformation induced by pipe jacking construction[J]. Rock and Soil Mechanics,2007,28(3):619-624.
[4]ZHANG Dingwen, LIU Bo, QIN Yujun. Construction of a largesection long pedestrian underpass using pipe jacking in muddy silty clay: A case study[J].Tunnelling and Underground Space Technology,2016,60:151-164.
[5]阳军生, 刘宝琛. 城市隧道施工引起的地表移动及变形[M].北京:中国铁道出版社,2002.
YANG Junsheng, LIU Baochen. Surface movement and deformation caused by urban tunnel construction[M]. Beijing: China Railway Publishing House, 2002.
[6]许有俊, 王雅健, 冯超, 等. 矩形顶管施工引起的地面沉降变形研究[J].地下空间与工程学报,2018,14(1):192-199.
XU Youjun, WANG Yajian, FENG Chao, et al. Research on ground deformation caused by rectangular pipe jacking construction[J].Chinese Journal of Underground Space and Engineering,2018,14(1):192-199.
[7]李辉, 杨贵阳, 宋战平, 等.矩形顶管施工引起土体分层变形计算方法研究[J].地下空间与工程学报,2019,15 (5):1482-1489.
LI Hui,YANG Guiyang, SONG Zhanping, et al. Study on Calculation Method of Soil Delamination Deformation Caused by Rectangular Pipe Jacking Construction[J]. Chinese Journal of Underground Space and Engineering, 2019,15(5):1482-1489.
[8]王洪新. 土压平衡盾构刀盘挤土效应及刀盘开口率对盾构正面接触压力影响[J].土木工程学报,2009,42(7): 113-118.
WANG Hongxin. Effect of cutterhead compressing the front soil and influence of head aperture ratio on contact pressure of EPB shield to the front soil[J].China Civil Engineering Journal,2009,42(7):113-118.
[9]王洪新. 土压平衡盾构刀盘开口率对土舱压力的影响[J].地下空间与工程学报,2012,8(1):89-94.
WANG Hongxin. Influence of aperture ratio of cutterhead of EPB shield on earth pressure in the chamber[J]. Chinese Journal of Underground Space and Engineering,2012, 8(1):89-94.
[10]史明.地下综合管廊矩形顶管法施工诱发地层隆起变形规律研究[D].包头:内蒙古科技大学, 2018.
SHI Ming. Study on the deformation law of ground uplift induced by rectangular pipe jacking method in underground comprehensive pipe corridor[D].Baotou: Inner Mongolia University of Science and Technology, 2018.
[11]王雅健.土压平衡矩形顶管施工引起的地面变形研究[D].包头:内蒙古科技大学,2016.
WANG Yajian. Study on ground deformation caused by earth pressure balanced rectangular pipe jacking[D].Baotou: Inner Mongolia University of Science and Technology, 2016.

备注/Memo

备注/Memo:
收稿日期:2018-06-20修改稿日期:2019-12-13
基金项目:国家自然基金项目(51868062);内蒙古自治区自然科学基金项目(2017MS(LH)0523)
第一作者:许有俊(1979-),男,博士,教授,主要从事隧道、地下空间等方面的研究.E-mail:xyoujun@163.comDOI:
更新日期/Last Update: 2020-01-20