参考文献/References:
[1] 刘学成,我国房地产业中长期发展趋势分析[J]. 经管研究,2011(11):70-73.
LIU xuecheng,. Analysis on the medium and long-term development trend of my country’s real estate industry[J]. Jing Guan Yan Jiu, 2011(11):70-73.
[2] BARLISH K, SULLIVAN K. How to measure the benefits of BIM: A case study approach[J]. Automation in Construction, 2011, 24:149-159.
[3] WON J,CHENG J C,LEE G.Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea[J]. Waste Manag, 2016, 49:170-180.
[4] EASTMAN C,TEICHOLZ P,SACKS R,et al, BIM handbook: A guide to building information modeling for owners [M]. New Jersey: Wily 2011.
[5] 高敏,郝生跃.我国建筑业BIM应用影响因素研究——基于因子分析法[J]. 工程管理学报,2019,33(4):38-42.
GAO min,HAO shengyue. A Study of Influencing Factors for BIM Application in Chinese Construction Industry Based on Factor Analysis[J]. Jounal of Engineeing Managment, 2019,33(4):42-46.
[6] BRYDE D,BROQUETAS M,VOLM I M. The project benefit of building information modelling(BIM)[J]. International Journal of Project Management, 2014,31: 971-980.
[7] HERVA M, HAAPASALO H, HALTTUL H A. Barriers to achieving the benefits of BIM[J]. International Journal of 3-D Information Modeling, 2015,4(4):16-33.
[8] OLAWUMI TIMOTHY O, CHAN,DANIEL W M,WONG,et al. Barriers to the integration of BIM and sustainability practices in construction projects: A Delphi survey of international experts[J]. Journal of Building Engineering, 2018,20: 60-71.
[9] FOUNTAIN J, LANGAR S. Building Information Modeling(BIM)outsourcing among general contractors [J]. Automation in Construction, 2018,95: 107-117.
[10]SCHIEG M. Strategies for avoiding asymmetric information in construction project management [J].Journal of Business Economics and Management,2008,9:47-51.
[11]ROSE T M,MANLEY K.Client recommendations for financial incentives on construction projects [J]. Engineering,Construction and Architectural Management. 2010,17:252-267.
[12]LOVE P E,DAVIS P R,CHEVIS R. Risk/reward compensation model for civil engineering infrastructure alliance projects[J]. Journal of Construction Engineering and Management,2011,137:127-136.
[13]ARRIGHETTI A, BACHMANN R,DEAKIN S. Contract in construction contracts and its critique[J]. Journal of Construction and Management,2011,137:127-136.
[14]CHANG. Principal-agent model of risk allocation in construction contracts and its critique[J]. Journal of Construction Engineering and Management,2014,1:13-32.
[15]陈勇强,傅永程,华冬冬.基于多任务委托代理的业主与承包商激励模型[J],管理科学学报,2016,19(4):45-55.
CHEN yongqiang. FU yongcheng. HUA dongdong.A multi-task incentive model between the owner and contractor[J]. Journal of Management Sciences in China. 2016,19(4):45-55.
[16]SON H,LEE S,KIM C. What drives the adoption of building information modeling in design organizations? Anempirical investigation of the antecedents affecting architects’ behavioral intentions[J]. Automation in Construction,2015,49:92-99.
[17]赵彬,刘星. 基于BIM的房地产供应链管理研究[J]. 项目管理技术,2016(14):40-44.
ZHAO bin, LIU xing, Research on real estate supply chain management based on BIM[J]. Projece Management Tehchnology. 2016(14):40-44.
[18]高颖,张水波,冯卓.不完全合约下 PPP 项目的运营期延长决策机制[J]. 管理科学学报,2014(18):48-57.
GAO Yin, ZHANG Shuibo,FENG Zhuo. Decision-making mechanism for extending the operation period of PPP projects under incomplete contracts[J]. Journal of Management Sciences In China. 2014(18):48-57.
[19]DUFFY J,OCHS J.Cooperative behavior and the frequency of social interaction [J]. Games and Economic Behavior, 2009,66:785-812.
[20]AZHAR,S. Building information modeling(BIM):trend, bennfits, risks and challenges for the AEC industry [J]. Leader-Ship and Management in Engineering, 2011, 11:241-252.
[21]SEBASTIAN R.Changing roles on the clients,architects and constractor through BIM[J]. Engineering,Construction and Architectural Management,2011,18:176-187.
相似文献/References:
[1]王 茹,孙卫新,张 祥.明清古建筑构件参数化信息模型实现技术研究[J].西安建筑科技大学学报(自然科学版),2013,45(04):479.[doi:10.15986/j.1006-7930.2013.04.004]
WANG Ru,SUN Wei-xin,ZHANG Xiang.Research on parametric information model of ancient buildings of Ming and Qing Dynasties[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2013,45(04):479.[doi:10.15986/j.1006-7930.2013.04.004]
[2]胡长明,熊焕军,龙辉元,等.基于BIM 的建筑施工项目进度-成本联合控制研究[J].西安建筑科技大学学报(自然科学版),2014,46(04):474.[doi:10.15986/j.1006-7930.2014.04.003]
HU Changming,XIONG Huanjun,LONG Huiyuan,et al.Study on cost and schedule combined control of 4D model based on building information modeling(BIM)[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2014,46(04):474.[doi:10.15986/j.1006-7930.2014.04.003]