参考文献/References:
[1]王啸楠,高旭杰. 螺栓钢板接缝连接装配式混凝土剪力墙的受力性能分析[J].建筑结构,2019,49(S2):526-530.
WANG Xiaonan,GAO Xujie. Mechanical behaviors analysis of precast concrete shear wall with bolted steel plate joints[J].Building Structure,2019,49(S2):526-530.
[2]中华人民共和国住房城乡建设部:装配式混凝土结构技术规程:JGJ1-2014,[S].北京:中国建筑工业出版社,2017.
Ministy of housing and Urban-Raral Development of P R China.Technical specification for precast concrete structures:JGJ1-2014,[S].Beijing:China Architecture& Building Press,2017.
[3]黄小坤,田春雨,万墨林,等. 我国装配式混凝土结构的研究与实践[J].建筑科学,2018,34(9):50-55.
HUANG Xiaokun,TIAN Chunyu,WAN Molin,et al. Research and applications of precast concrete structures in China[J].Building Science,2018,34(9):50-55.
[4]JOSé F R, CARLOS A B, JOSé I R, et al. Seismic performance of precast concrete column-to-column lap-splice connections[J].Engineering Structures,2018,172:687-699.
[5]SAEED B, MORTEZA M, FATEMEH S, et al. Behavior of two new moment resisting precast beam to column connections subjected to lateral loading[J].Engineering Structures,2017,132:808-821.
[6]YANG K H, OH M H, KIM M H, et al. Flexural behavior of hybrid precast concrete beams with H-steel beams at both ends[J].Engineering Structures,2010,32(9):2940-2949.
[7]张艳霞,程梦瑶,张爱林,等. 箱形柱整体芯筒式全螺栓连接受力性能研究[J].建筑结构学报,2020,41(5):180-189.
ZHANG Yanxia,CHENG Mengyao,ZHANG Ailin,et al. Performance of box-shaped column connection achieved with core sleeve and bolts[J].Journal of Building Structures,2020,41(5):180-189.
[8]刘付钧,李盛勇,李定乾,等. 免模装配一体化钢筋混凝土结构体系关键技术开发及研究[J].建筑结构,2020,50(4):8-12.
LIU Fujun,LI Shengyong,LI Dingqian,et al. Key techniques development and research of formwork-free precast integration system of RC structure[J].Building Structure,2020,50(4):8-12.
[9]张晋元,王昊,王金泽,等. 新型装配式混凝土柱柱节点理论分析与数值模拟[J].工业建筑,2019,49(1):85-90,114.
ZHANG Jinyuan,WANG Hao,WANG Jinze,et al. Theoretical analysis and numerical simulation of a novel precast concrete column-column joint[J].Industrial Construction,2019,49(1):85-90,114.
[10]张爱林,李超,姜子钦,等. 装配式钢结构梁柱-柱法兰连接节点受力机理研究[J].工业建筑,2018,48(5):11-17.
ZHANG Ailin,Li Chao,JIANG Ziqin,et al. Research on stress mechanism of beam-column flange connections of prefabricated steel structure[J].Industrial Construction,2018,48(5):11-17.
[11]CAMNASIO E. Bolted column connection for seismic applications[J].Betonwerk + Fertigteil-Technik/Concrete Plant + Precast Technology,2017,83(8):36-43.
[12]高欣,陈琳彦,皮宗婕,等. 装配式混凝土结构施工风险管控机制[J].同济大学学报(自然科学版),2019,47(11):1676-1682.
GAO Xin,CHEN Linyan,PI Zongjie,et al. Construction risk control mechanism for fabricated concrete structure[J].Journal of Tongji University(Natural Science),2019,47(11):1676-1682.
[13]胡长明,汪杰,李家涛,等. 混凝土浇筑过程中高支模力学响应的全程分析[J].工业建筑,2013,43(2):88-93,133.
HU Changming,WANG Jie,LI Jiatao,et al. The full analysis of high support system for formwork during the construct of the roof[J].Industrial Construction,2013,43(2):88-93,133.
[14]段联保. 混凝土施工质量监理控制研究[J].工业建筑,2011,41(S1):1122-1125.
DUAN Lianbao. Research on supervision of concrete construction quality[J].Industrial Construction,2011,41(S1):1122-1125.
[15]中华人民共和国住房和城乡建设部.建筑施工模板安全技术规范:JGJ162-2008[S].北京:中国建筑工业出版社,2008.
Ministy of housing and Urban-Raral Development of P R China.Technical code for safety of construction formwork:JGJ162-2008[S].Beijing:China Architecture& Building Press,2008.
[16]中华人民共和国住房和城乡建设部:钢结构设计标准[S].北京:GB 50017-2017,中国建筑工业出版社,2017.
Ministy of housing and Urban-Raral Development of P R China.Standard for design of steel structures:GB 50017-2017[S].Beijing:China Architecture& Building Press,2017.