参考文献/References:
References
[1] 邓铁军. 结构工程施工系统可靠性理论方法及其应用的研究[D].长沙:湖南大学博士学位论文, 2007:4-7.
DENG Tie-jun. Research on theory and method of reliability in structural engineering construction system[D]. Changsha: Hunan university,2007:4-7.
[2] (苏)C.A.乌沙茨基,刘统畏.城市建设组织计划与管理[M].北京:中国建筑工业出版社,1988:45-62)C A, LIU Tongwei. Urban construction planning and management[M]. Beijing: China Construction Industry Press, 1988:45-62.
[3] 中国建筑学会.工程网络计划技术规程教程[M].北京:中国建筑工业出版社,2000:3-15 Architectural Society . Course of Network planning technique[M]. Beijing: China Construction Industry Press, 2000:3-15.
[4] KERNER H. Project management:A systems approach to planning, scheduling and controlling[M].New York:John Wiley&Son,Inc.Press,2006:417-451.
[5] 梅启智, 廖炯生, 孙惠中. 系统可靠性工程基础[M]. 北京: 科学出版社, 1992:76-87.
MEI Qi-zhi, LIAO Jiong-sheng, SUN Hui-zhong. Engineering Foundation of System Reliability[M]. Beijing: China Science Press,
1992:76-87.
[6] 杰弗里K.宾图. 项目管理M]. 北京: 机械工业出版社,2009:1-5.
JEFFREY K P. Project management achieving competitive advantage[M]. Beijing: China Machine Press, 2009:1-5.
[7] STWART M G. Role of load history in reliability–based decision analysis of ageing bridges[J].Journal of Structures Engineering, ASCE, 1999,125(7):776-783.
[8] 陆宁, 史玉芳, 等. 施工工序子系统可靠性的确定方法研究[J]. 西安建筑科技大学学报:自然科学版, 2006,38(3): 311-315.
LU Ning, SHI Yu-fang, et al. Calculation method of construction working procedure[J].J.Xi’an Univ. of Arch. & Tech. :Natural Science Edition, 2006, 38(3):311-315.
[9] 曹晋华, 李 伟, 刘斌. 可靠性理论、方法及应用[M]. 北京: 机械工业出版社, 1994:98-102.
CAO Jin-hua, LI Wei, LIU Bin. Reliability theory, method &applicationM]. Beijing: China Machine Press,1994: 98-102.
[10] 李东魁. 网络系统可靠度的BDD算法[J].通信技术, 2009, 42(11):149-150.
LI Dong-kui. New algorithm for computing network system reliability[J]. Communications Technology, 2009, 42(11):149-150.
[11] 武小悦, 沙基昌. 网络系统可靠度的BDD算法[J].系统工程与电子技术, 1999, 21(7): 72-73.
WU Xiao-yue, SHA Ji-chang. A BDD algorithm for network reliability[J]. Systems Engineering and Electronics, 1999, 21(7): 72-73
相似文献/References:
[1]蒋卫平,张 谦,乐 云,等.工程项目中信任的产生与影响——基于承包商方视角[J].西安建筑科技大学学报:自然科学版,2012,44(01):97.[doi:10.15986/j.1006-7930.2012.01.016]
JIANG Wei-ping,ZHANG Qian,LE Yun,et al.Occurrence and function of trust in construction projects from the view of the contractor[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2012,44(01):97.[doi:10.15986/j.1006-7930.2012.01.016]
[2]卢 梅,刘 洋,金 婷,等.基于SD及模糊控制的工程项目目标管理[J].西安建筑科技大学学报:自然科学版,2012,44(03):400.[doi:10.15986/j.1006-7930.2012.03.016]
LU Mei,LIU Yang,JIN Ting,et al.Objective management in the project based on the SD and fuzzy control[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2012,44(01):400.[doi:10.15986/j.1006-7930.2012.03.016]
[3]史玉芳,王秀芬,康 珅.基于模糊的工程项目施工可靠性评价研究[J].西安建筑科技大学学报:自然科学版,2015,47(05):740.[doi:DOI:10.15986/j.1006-7930.2015.05.023]
SHI Yufang,WANG Xiufen,KANG Shen.Study on evaluation of construction reliability for engineering project[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(01):740.[doi:DOI:10.15986/j.1006-7930.2015.05.023]
[4]史泽运,李勇.基于系统动力学的国际工程项目承包商单因素风险处置模式逻辑构建研究[J].西安建筑科技大学学报:自然科学版,2018,50(04):609.[doi:10.15986/j.1006-7930.2018.04.022]
SHI Zeyun,LI Yong.Research on the logical construction of single factor risk disposal model for international engineering project contractors based on system dynamics[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2018,50(01):609.[doi:10.15986/j.1006-7930.2018.04.022]