[1]史玉芳,李慧民,陆宁.工程项目施工系统可靠性及计算方法研究[J].西安建筑科技大学学报:自然科学版,2011,43(01):125-130.[doi:DOI:10.15986/j.1006-7930.2011.01.001]
 SHI Yu-fang,LI Hui-min,LU Ning.Research on construction system reliability of construction projectand its calculation method[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2011,43(01):125-130.[doi:DOI:10.15986/j.1006-7930.2011.01.001]
点击复制

工程项目施工系统可靠性及计算方法研究()
分享到:

西安建筑科技大学学报:自然科学版[ISSN:1006-7930/CN:61-1295/TU]

卷:
43
期数:
2011年01期
页码:
125-130
栏目:
出版日期:
2011-02-28

文章信息/Info

Title:
Research on construction system reliability of construction project
and its calculation method
文章编号:
1006-7930(2011)01-0125-06
作者:
史玉芳12李慧民1陆宁3
(1.西安建筑科技大学土木学院,陕西西安710055;2.西安科技大学管理学院,陕西西安710054;
3.长安大学建筑工程学院,陕西西安710061)
Author(s):
SHI Yu-fang12 LI Hui-min1LU Ning3
(1. School of Civil Eng. , Xian Univ. of Arch. & Tech. , Xian 710055, China; 2. School of Management, Xian Univ. of Sin & Tech. , Xian 710054, China; 3. School of Civil Eng. , Changan Univ. , Xian 710061, China)
关键词:
工程项目施工系统施工可靠性不交化最小路集
Keywords:
engineering project construction system construction reliabilitydisjointed minimal paths set
分类号:
TU721
DOI:
DOI:10.15986/j.1006-7930.2011.01.001
文献标志码:
A
摘要:
系统可靠性理论与方法是近年来系统工程与管理科学领域的一个研究热点,而工程项目管理领域的
系统可靠性及其应用研究尚处于开始探索阶段.基于工程项目管理的目标体系,提出了工程项目施工系统可
靠性的概念,界定其内涵为工程项目的质量可达性、成本经济性、资源均衡性、工期合理性和施工安全性的总
和.根据工程项目施工系统组合性和层次性的特点,构建了施工系统可靠性计算的金字塔模型,运用不交化最
小路集法计算工程项目施工系统的可靠性,并给出了系统可靠性计算的符号表达式.最后,工程实例验证了该
方法的有效性.为工程项目施工系统可靠性理论与方法研究做了有益的尝试.
Abstract:
System reliability theory is becoming?a?focus of international management science and?system engineering research, though specific studies?are?still?at?a?starting?stage in the field of engineering project management. According to objective system of engineering project, the connotation of construction system reliability is defined that it is the sum of quality attainability, cost economies, resource equilibrium, working time credibility and construction safety of engineering project. Based on hierarchy and composability of project construction system, a pyramid model is built. Based on the principle of network reliability, a method of disjointed minimal paths set is proposed and the symbol expression formula is given to calculate construction system reliability. This method is proved efficient and accurate by an example and it’s an useful try on theory and method research of engineering project system reliability

参考文献/References:

References
[1] 邓铁军. 结构工程施工系统可靠性理论方法及其应用的研究[D].长沙:湖南大学博士学位论文, 2007:4-7.
DENG Tie-jun. Research on theory and method of reliability in structural engineering construction system[D]. Changsha: Hunan university,2007:4-7.
[2] (苏)C.A.乌沙茨基,刘统畏.城市建设组织计划与管理[M].北京:中国建筑工业出版社,1988:45-62)C A, LIU Tongwei. Urban construction planning and management[M]. Beijing: China Construction Industry Press, 1988:45-62.
[3] 中国建筑学会.工程网络计划技术规程教程[M].北京:中国建筑工业出版社,2000:3-15 Architectural Society . Course of Network planning technique[M]. Beijing: China Construction Industry Press, 2000:3-15.
[4] KERNER H. Project management:A systems approach to planning, scheduling and controlling[M].New York:John Wiley&Son,Inc.Press,2006:417-451.
[5] 梅启智, 廖炯生, 孙惠中. 系统可靠性工程基础[M]. 北京: 科学出版社, 1992:76-87.
MEI Qi-zhi, LIAO Jiong-sheng, SUN Hui-zhong. Engineering Foundation of System Reliability[M]. Beijing: China Science Press,
1992:76-87.
[6] 杰弗里K.宾图. 项目管理M]. 北京: 机械工业出版社,2009:1-5.
JEFFREY K P. Project management achieving competitive advantage[M]. Beijing: China Machine Press, 2009:1-5.
[7] STWART M G. Role of load history in reliability–based decision analysis of ageing bridges[J].Journal of Structures Engineering, ASCE, 1999,125(7):776-783.
[8] 陆宁, 史玉芳, 等. 施工工序子系统可靠性的确定方法研究[J]. 西安建筑科技大学学报:自然科学版, 2006,38(3): 311-315.
LU Ning, SHI Yu-fang, et al. Calculation method of construction working procedure[J].J.Xi’an Univ. of Arch. & Tech. :Natural Science Edition, 2006, 38(3):311-315.
[9] 曹晋华, 李 伟, 刘斌. 可靠性理论、方法及应用[M]. 北京: 机械工业出版社, 1994:98-102.
CAO Jin-hua, LI Wei, LIU Bin. Reliability theory, method &applicationM]. Beijing: China Machine Press,1994: 98-102.
[10] 李东魁. 网络系统可靠度的BDD算法[J].通信技术, 2009, 42(11):149-150.
LI Dong-kui. New algorithm for computing network system reliability[J]. Communications Technology, 2009, 42(11):149-150.
[11] 武小悦, 沙基昌. 网络系统可靠度的BDD算法[J].系统工程与电子技术, 1999, 21(7): 72-73. 
WU Xiao-yue, SHA Ji-chang. A BDD algorithm for network reliability[J]. Systems Engineering and Electronics, 1999, 21(7): 72-73

相似文献/References:

[1]蒋卫平,张 谦,乐 云,等.工程项目中信任的产生与影响——基于承包商方视角[J].西安建筑科技大学学报:自然科学版,2012,44(01):97.[doi:10.15986/j.1006-7930.2012.01.016]
 JIANG Wei-ping,ZHANG Qian,LE Yun,et al.Occurrence and function of trust in construction projects from the view of the contractor[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2012,44(01):97.[doi:10.15986/j.1006-7930.2012.01.016]
[2]卢 梅,刘 洋,金 婷,等.基于SD及模糊控制的工程项目目标管理[J].西安建筑科技大学学报:自然科学版,2012,44(03):400.[doi:10.15986/j.1006-7930.2012.03.016]
 LU Mei,LIU Yang,JIN Ting,et al.Objective management in the project based on the SD and fuzzy control[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2012,44(01):400.[doi:10.15986/j.1006-7930.2012.03.016]
[3]史玉芳,王秀芬,康 珅.基于模糊的工程项目施工可靠性评价研究[J].西安建筑科技大学学报:自然科学版,2015,47(05):740.[doi:DOI:10.15986/j.1006-7930.2015.05.023]
 SHI Yufang,WANG Xiufen,KANG Shen.Study on evaluation of construction reliability for engineering project[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2015,47(01):740.[doi:DOI:10.15986/j.1006-7930.2015.05.023]
[4]史泽运,李勇.基于系统动力学的国际工程项目承包商单因素风险处置模式逻辑构建研究[J].西安建筑科技大学学报:自然科学版,2018,50(04):609.[doi:10.15986/j.1006-7930.2018.04.022]
 SHI Zeyun,LI Yong.Research on the logical construction of single factor risk disposal model for international engineering project contractors based on system dynamics[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2018,50(01):609.[doi:10.15986/j.1006-7930.2018.04.022]

备注/Memo

备注/Memo:
收稿日期:2010-03-12  修改稿日期:2010-12-29
基金项目:陕西省自然科学基金资助项目(2005E211)
作者简介:史玉芳(1980-),女,山东济南人,博士生,讲师,主要从事工程项目管理教学与科研工作.
更新日期/Last Update: 2015-11-01