参考文献/References:
[1] 王光远.论时变结构力学[J].土木工程学报,2000,33(6):105-108.
WANG Guang-yuan.On Mechanics of time-varying structure[J].China Civil Engineering Journal,2000,33(6):105-108.
[2] 曹志远.土木工程分析的施工力学与时变力学基础[J].土木工程学报,2001,34(3):41-45.
CAO Zhi-yuan.Construction mechanics and time-varying mechanics in civil engineering[J].China Civil Engineering Journal,2001,34(3):41-45.
[3] CHOI C K,KIM E D.Multistory frames under sequential gravity loads[J].Journal of Structural Engineering,ASCE,1985,111(11):2373-2384.
[4] CHOI C K,CHUNG H K,LEE D G,et al.Simplified building analysis with sequential dead loads-CFM[J].Journal of Structural Engineering,ASCE,1992,188(4):944-954.
[5] 范 重,刘先明,胡天兵,等.国家体育场钢结构施工过程模拟分析[J].建筑结构学报,2007,28(4):134-143.
FANG Zhong,LIU Xian-ming,Hu Tian-bing,et al.Simulation analysis on steel structure erection procedure of the National Stadium[J].Journal of Building Structures,2007,28(4):134-143.
[6] 崔晓强,郭彦林,叶可明.大跨度钢结构施工过程的结构分析方法研究[J].工程力学,2006,23(5):83-88.
CUI Xiao-qiang,GUO Yan-lin,YE Ke-ming.Research on the construction mechanics method of long-span steel structure[J].Engineering Mechanics,2006,23(5):83-88.
[7] 刘学武,郭彦林,张庆林,等.CCTV新台址主楼施工过程结构内力和变形分析[J].工业建筑,2007,37(9):22-29.
LIU Xue-wu,GUO Yan-lin,ZHANG Qing-lin,et al.Analysis of internal force and deformation for the new CCTV headquarters during the construction process[J].Industrial Construction,2007,37(9):22-29.
[8] 郭彦林,崔晓强.大跨度复杂钢结构施工过程中的若干技术问题及探讨[J].工业建筑,2004,34(12):1-5.
GUO Yan-lin,CUI Xiao-qiang.Key mechanical problems and their discussion in construction process of larger-span steel structures[J].Industrial Construction,2004,34(12):1-5.
[9] 郭彦林,刘学武.钢结构施工力学状态非线性分析方法[J].工程力学,2008,25(10):19-24.
GUO Yan-lin,LIU Xue-wu.State nonlinear finite element method for construction mechanics analysis of steel structure[J].Engineering Mechanics,2008,25(10):19-24.
[10] 郝际平,郑 江,王先铁,等.大运会主体育场施工过程力学模拟与分析[J].西安建筑科技大学学报:自然科学版,2010,42(4):457-463.
HAO Ji-ping,ZHENG Jiang,WANG Xian-tie,et al.Mechanic simulation and analysis of the main palaestra of the world university games during the construction process[J].J.Xi′an Univ.of Arch.& Tech.:Natural Science Edition,2010,42(4):457-463.
[11] 田黎敏,郝际平,陈 韬,等.世界大学生运动会主体育场施工过程模拟分析[J].建筑结构学报,2011,32(5):70-77.
TIAN Li-min,HAO Ji-ping,CHEN Tao,et al.Simulation analysis on erection procedure of main stadium for the Universidad Sports Centre[J].Journal of Building Structures,2011,32(5):70-77.
[12] 田黎敏,郝际平,戴立先,等.深圳湾体育中心结构施工过程模拟分析[J].建筑结构,2011,41(12):118-121.
TIAN Li-min,HAO Ji-ping,DAI Li-xian,et al.Simulation analysis on erection procedure of Shenzhen bay sports center[J].Building Structures,2011,41(12):118-121.
相似文献/References:
[1]丁大益,郑 岩,马冬霞,等.合肥新桥国际机场航站楼结构设计[J].西安建筑科技大学学报:自然科学版,2013,45(01):18.[doi:10.15986/j.1006-7930.2013.01.004]
[2]钱 刚,计康生,谢 坚,等.天长全民健身中心体育场钢结构屋盖施工过程分析[J].西安建筑科技大学学报:自然科学版,2022,54(04):617.[doi:10.15986/j.1006-7930.2022.04.017]
QIAN Gang,JI Kangsheng,XIE Jian,et al.Analysis on construction process of steel structure roof of Tianchang national fitness center stadium[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2022,54(03):617.[doi:10.15986/j.1006-7930.2022.04.017]
[3]计康生,谢 坚,王明花,等.天长全民健身中心体育场钢屋盖结构铸钢节点施工阶段力学性能分析[J].西安建筑科技大学学报:自然科学版,2024,56(04):571.[doi:10.15986/j.1006-7930.2024.04.011]
JI Kangsheng,XIE Jian,WANG Minghua,et al.Mechanical properties analysis of cast steel joints in the construction stage of the steel roof structure of Tianchang national fitness center stadium[J].J.Xi’an Univ. of Arch. & Tech.:Natural Science Edition,2024,56(03):571.[doi:10.15986/j.1006-7930.2024.04.011]