参考文献/References:
[1]李镜培, 柏挺, 杨军. 框架逆作超大基坑施工对周边环境的影响[J]. 岩石力学与工程学报, 2012, 31(11): 2354-2362.
LI Jingpei, BAI Ting, YANG Jun. Influence of construction of super-large excavation with frame-top-down method on environments[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(11): 2354-2362.
[2]吴西臣, 徐杨青. 深厚软土中超大深基坑支护设计与实践[J]. 岩土工程学报, 2012, 34(s): 404-408.
WU Xichen, XU Yangqing. Design and practice of large-scale deep excavations in deep soft soils[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(s): 404-408.
[3]李华, 杜长勤, 陈克明. 上海银行数据处理中心超大深基坑土方开挖技术[J]. 施工技术, 2010, 39(1): 71-73.
LI Hua, Du Changqin, Chen Keming. Earth excavation technology of super-large foundation excavation of data processing center for bank of shanghai[J]. Construction Technology, 2010, 39(1): 71-73.
[4]张具寿, 黄沛, 钱水江, 等. 超大直径圆形无支撑深基坑施工技术[J]. 岩土工程学报, 2006, 28(s): 1737-1741.
ZHANG Jushou, HUANG Pei, QIAN Shuijiang, et al. Construction techniques of deep foundation pits with circular self-sustaining and super large diameter[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(s): 1737-1741.
[5]陈萍, 王卫东, 丁建峰. 相邻超大深基坑同步开挖的设计与实践[J]. 岩土工程学报, 2013, 35(s): 555-558.
CHEN Ping, WANG Weidong, DING Jianfeng. Design and application of synchronous construction of two neighboring deep excavations[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(s): 555-558.
[6]窦华港, 焦莹. 预留反压土中心顺作法在某超大深基坑中的应用[J]. 岩土工程学报, 2008, 30(s): 484-488.
DOU Huagang, JIAO Ying. Application of earthberm and bottom-up method in as extralarge deep excavation project[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(s): 484-488.
[7]田贺维, 周予启, 刘卫未. 天津津塔工程超大深基坑施工技术[J]. 施工技术, 2010, 39(1): 14-21.
TIAN Hewei, ZHOU Yuqi, LIU Weiwei. Construction technology of super large and deep foundation excavation in tianjin tower[J]. Construction Technology, 2010, 39(1): 14-21.
[8]侯玉杰, 余地华,艾心荧,等. 天津高银117大厦工程超大深基坑降水关键技术研究与应用[J]. 施工技术, 2014, 43(13): 1-5.
HOU Yujie,YU Dihua,AI Xinying, et al. Research and Application of dewatering key technology of ultra-large and deep foundation excavation in Tianjin goldin finance 117 Project[J]. Construction Technology, 2014, 43(13): 1-5.
[9]邹腾辉. 超大深基坑单边采用六级放坡挖土的施工实践[J]. 建筑施工, 2010, 32(3): 191-192.
ZOU Tenghui. Constructional practice on excavation with Six-Step slope at each side for super large and deep foundation Pit[J]. Building Construction, 2010, 32(3): 191-192.
[10]徐中华, 王建华, 王卫东. 上海地区深基坑工程中地下连续墙的变形性状[J]. 土木工程学报, 2008, 41(8): 81-86.
XU Zhonghua, WANG Jianhua, WANG Weidong. Defo-rmation behavior of diaphragm walls in deep excavations in Shanghai[J]. China Civil Engineering Journal, 2008, 41(8): 81-86.
[11]OU C Y, HSIEH P G, CHIOU D C. Characteristics of ground surface settlement during excavation[J]. Canadian Geotechnical Journal, 1993, 30(5): 758-767.
相似文献/References:
[1]梅 源,袁一力,胡长明,等.西安地铁深基坑变形模式统计规律分析[J].西安建筑科技大学学报(自然科学版),2016,48(03):371.[doi:10.15986/j.1006-7930.2016.03.011]
MEI Yuan,Yuan Yili,HU Changming,et al.Statistical analysis of the construction deformation model of the deep foundation pit in Xi’an Metro Station[J].J. Xi’an Univ. of Arch. & Tech.(Natural Science Edition),2016,48(03):371.[doi:10.15986/j.1006-7930.2016.03.011]